Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
291
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0318 # 03 Y:1990 | 03 | 1990 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,306 | $300 | Implemented |
UD0318 # 04 Y:1990 | 04 | 1990 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,599 | $0 | Implemented |
UD0318 # 05 Y:1990 | 05 | 1990 | INSTALL TIMERS AND/OR THERMOSTATS | $10,040 | $5,000 | Not Implemented |
UD0318 # 06 Y:1990 | 06 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,103 | $1,680 | Implemented |
UD0318 # 07 Y:1990 | 07 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,116 | $5,820 | Not Implemented |
UD0307 # 01 Y:1990 | 01 | 1990 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $4,728 | $100 | Implemented |
UD0307 # 02 Y:1990 | 02 | 1990 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $140 | $200 | Not Implemented |
UD0307 # 03 Y:1990 | 03 | 1990 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $721 | $1,425 | Not Implemented |
UD0306 # 01 Y:1990 | 01 | 1990 | OPTIMIZE PLANT POWER FACTOR | $3,681 | $6,000 | Not Implemented |
UD0306 # 02 Y:1990 | 02 | 1990 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,994 | $3,000 | Not Implemented |
UD0306 # 03 Y:1990 | 03 | 1990 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,064 | $4,000 | Not Implemented |
UD0306 # 04 Y:1990 | 04 | 1990 | INSTALL SET-BACK TIMERS | $3,650 | $0 | Not Implemented |
UD0306 # 05 Y:1990 | 05 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,668 | $100 | Not Implemented |
UD0264 # 01 Y:1988 | 01 | 1988 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $677 | $0 | Implemented |
UD0264 # 02 Y:1988 | 02 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $880 | $1,200 | Not Implemented |
UD0264 # 03 Y:1988 | 03 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,732 | $3,790 | Implemented |
UD0264 # 04 Y:1988 | 04 | 1988 | INSTALL STORM WINDOWS AND DOORS | $984 | $929 | Implemented |
UD0232 # 01 Y:1987 | 01 | 1987 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,451 | $0 | Not Implemented |
UD0232 # 02 Y:1987 | 02 | 1987 | INSULATE BARE EQUIPMENT | $3,368 | $795 | Implemented |
UD0232 # 03 Y:1987 | 03 | 1987 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,586 | $10,000 | Not Implemented |
UD0232 # 04 Y:1987 | 04 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,488 | $1,700 | Implemented |
UD0232 # 05 Y:1987 | 05 | 1987 | REDUCE GLAZED AREAS IN BUILDINGS | $3,241 | $8,860 | Not Implemented |
UD0224 # 01 Y:1987 | 01 | 1987 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,584 | $0 | Not Implemented |
UD0224 # 02 Y:1987 | 02 | 1987 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,048 | $7,200 | Not Implemented |
UD0224 # 03 Y:1987 | 03 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,509 | $6,000 | Not Implemented |