IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,509

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0547 # 01 Y:1995 01 1995 INSTALL TIMERS AND/OR THERMOSTATS $8,342 $5,800 Implemented
TN0547 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,062 $1,800 Not Implemented
TN0547 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $716 $468 Implemented
TN0547 # 04 Y:1995 04 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $131 $98 Implemented
TN0547 # 05 Y:1995 05 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,135 $0 Not Implemented
BD0025 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,949 $12,980 Implemented
BD0025 # 02 Y:1995 02 1995 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,321 $8,450 Not Implemented
BD0025 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,253 $400 Implemented
BD0025 # 04 Y:1995 04 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,558 $60 Implemented
BD0025 # 05 Y:1995 05 1995 RECOVER WASTE HEAT FROM EQUIPMENT $4,840 $2,500 Implemented
BD0025 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $2,685 $1,050 Implemented
BD0025 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,086 $712 Implemented
NV0023 # 01 Y:1995 01 1995 PAY UTILITY BILLS ON TIME $1,013 $0 Implemented
NV0023 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,321 $461 Not Implemented
NV0023 # 03 Y:1995 03 1995 INSULATE BARE EQUIPMENT $1,781 $1,245 Implemented
NV0023 # 04 Y:1995 04 1995 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $4,488 $1,600 Not Implemented
NV0023 # 05 Y:1995 05 1995 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $31,162 $100,000 Not Implemented
NV0023 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $2,296 $224 Not Implemented
NV0023 # 07 Y:1995 07 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,613 $694 Not Implemented
NV0023 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $424 $100 Implemented
NV0021 # 01 Y:1995 01 1995 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $7,310 $34,560 Not Implemented
NV0021 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $723 $1,540 Not Implemented
NV0021 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $497 $390 Implemented
NV0021 # 04 Y:1995 04 1995 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,709 $5,000 Not Implemented
NV0021 # 05 Y:1995 05 1995 INSULATE BARE EQUIPMENT $215 $98 Not Implemented