IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,509

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0065 # 05 Y:1993 05 1993 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,871 $5,900 Not Implemented
UF0065 # 06 Y:1993 06 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,015 $3,000 Not Implemented
OK0407 # 01 Y:1993 01 1993 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $23,207 $118,871 Not Implemented
OK0407 # 02 Y:1993 02 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,004 $0 Implemented
OK0407 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,186 $360 Not Implemented
OK0407 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,059 $0 Implemented
OK0407 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $971 $903 Implemented
OK0407 # 06 Y:1993 06 1993 INSTALL SET-BACK TIMERS $725 $750 Implemented
AM0179 # 01 Y:1993 01 1993 OPTIMIZE PLANT POWER FACTOR $34,850 $45,000 Implemented
AM0179 # 02 Y:1993 02 1993 USE RADIANT HEATER FOR SPOT HEATING $14,970 $10,890 Not Implemented
AM0179 # 03 Y:1993 03 1993 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,850 $0 Implemented
AM0179 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,280 $500 Implemented
AM0179 # 05 Y:1993 05 1993 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,640 $0 Not Implemented
AM0179 # 06 Y:1993 06 1993 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,210 $1,230 Not Implemented
AM0179 # 07 Y:1993 07 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $760 $3,920 Not Implemented
WV0001 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $241 $144 Implemented
WV0001 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $457 $930 Implemented
WV0001 # 03 Y:1993 03 1993 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $140 $170 Implemented
WV0001 # 04 Y:1993 04 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $120 $60 Implemented
WV0001 # 05 Y:1993 05 1993 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $480 $450 Implemented
WV0001 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $36 $30 Implemented
AM0178 # 01 Y:1993 01 1993 OPTIMIZE PLANT POWER FACTOR $48,960 $72,000 Not Implemented
AM0178 # 02 Y:1993 02 1993 OPTIMIZE PLANT POWER FACTOR $34,000 $38,500 Implemented
AM0178 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,960 $600 Not Implemented
AM0178 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,760 $24,300 Not Implemented