Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,509
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0225 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,463 | $2,250 | Implemented |
MZ0225 # 05 Y:2017 | 05 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,752 | $550 | Implemented |
MZ0225 # 06 Y:2017 | 06 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,716 | $5,600 | Not Implemented |
MZ0225 # 07 Y:2017 | 07 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,904 | $15,775 | Implemented |
MZ0225 # 08 Y:2017 | 08 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,021 | $4,675 | Implemented |
MZ0225 # 09 Y:2017 | 09 | 2017 | INSTALL OCCUPANCY SENSORS | $1,491 | $760 | Not Implemented |
BS0093 # 01 Y:2017 | 01 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,874 | $500 | Not Implemented |
BS0093 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $999 | $4,977 | Not Implemented |
BS0093 # 03 Y:2017 | 03 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $146 | $30 | Not Implemented |
BS0093 # 04 Y:2017 | 04 | 2017 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $58 | $590 | Not Implemented |
BS0093 # 05 Y:2017 | 05 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $203 | $628 | Not Implemented |
OR0681 # 01 Y:2017 | 01 | 2017 | USE OPTIMUM TEMPERATURE | $7,040 | $0 | Not Implemented |
OR0681 # 02 Y:2017 | 02 | 2017 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $12,375 | $2,995 | Not Implemented |
OR0681 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,360 | $532 | Not Implemented |
LE0426 # 01 Y:2016 | 01 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,840 | $1,000 | Implemented |
LE0426 # 02 Y:2016 | 02 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,562 | $2,000 | Implemented |
LE0426 # 03 Y:2016 | 03 | 2016 | REDUCE VENTILATION AIR | $102,120 | $52,500 | Not Implemented |
LE0426 # 04 Y:2016 | 04 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,322 | $780 | Implemented |
LE0426 # 05 Y:2016 | 05 | 2016 | INSTALL OCCUPANCY SENSORS | $3,070 | $3,000 | Not Implemented |
LE0426 # 06 Y:2016 | 06 | 2016 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $16,120 | $35,000 | Not Implemented |
LE0426 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,376 | $16,500 | Not Implemented |
LE0426 # 08 Y:2016 | 08 | 2016 | INSTALL OCCUPANCY SENSORS | $454 | $1,300 | Not Implemented |
LE0426 # 09 Y:2016 | 09 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,579 | $13,747 | Implemented |
LE0426 # 10 Y:2016 | 10 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $179 | $780 | Implemented |
LE0426 # 11 Y:2016 | 11 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,435 | $12,000 | Implemented |