IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,509

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0131 # 03 Y:2006 03 2006 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $16,391 $29,320 Implemented
MI0131 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,321 $1,074 Implemented
MI0131 # 05 Y:2006 05 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,701 $180 Implemented
MI0131 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $5,552 $216 Implemented
MI0131 # 07 Y:2006 07 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,332 $0 Implemented
MI0131 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,254 $30 Implemented
BD0314 # 01 Y:2006 01 2006 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $9,543 $0 Not Implemented
BD0314 # 02 Y:2006 02 2006 USE SYNTHETIC LUBRICANT $1,020 $1,500 Not Implemented
BD0314 # 03 Y:2006 03 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $491 $1,250 Implemented
BD0314 # 04 Y:2006 04 2006 USE RADIANT HEATER FOR SPOT HEATING $7,677 $9,600 Not Implemented
BD0314 # 05 Y:2006 05 2006 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,824 $1,200 Not Implemented
BD0314 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,382 $4,955 Not Implemented
BD0314 # 07 Y:2006 07 2006 INSTALL OCCUPANCY SENSORS $1,221 $525 Not Implemented
BD0314 # 08 Y:2006 08 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $421 $1,230 Not Implemented
AS0422 # 01 Y:2006 01 2006 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $562,419 $119,490 n/a
AS0422 # 02 Y:2006 02 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,736 $9,000 n/a
AS0422 # 03 Y:2006 03 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,763 $33,120 n/a
AS0422 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $231 $13,918 n/a
AS0422 # 05 Y:2006 05 2006 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,824 $0 n/a
AM0510 # 01 Y:2006 01 2006 INSTALL SKYLIGHTS $19,700 $45,100 Not Implemented
AM0510 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,610 $8,000 Implemented
AM0510 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,980 $700 Implemented
AM0510 # 04 Y:2006 04 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $2,930 $0 Implemented
AM0510 # 05 Y:2006 05 2006 RECOVER AND REUSE WASTE MATERIAL $2,290 $0 Implemented
AM0510 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,290 $100 Implemented