Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,509
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0131 # 03 Y:2006 | 03 | 2006 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $16,391 | $29,320 | Implemented |
MI0131 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,321 | $1,074 | Implemented |
MI0131 # 05 Y:2006 | 05 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $8,701 | $180 | Implemented |
MI0131 # 06 Y:2006 | 06 | 2006 | INSULATE BARE EQUIPMENT | $5,552 | $216 | Implemented |
MI0131 # 07 Y:2006 | 07 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,332 | $0 | Implemented |
MI0131 # 08 Y:2006 | 08 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,254 | $30 | Implemented |
BD0314 # 01 Y:2006 | 01 | 2006 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $9,543 | $0 | Not Implemented |
BD0314 # 02 Y:2006 | 02 | 2006 | USE SYNTHETIC LUBRICANT | $1,020 | $1,500 | Not Implemented |
BD0314 # 03 Y:2006 | 03 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $491 | $1,250 | Implemented |
BD0314 # 04 Y:2006 | 04 | 2006 | USE RADIANT HEATER FOR SPOT HEATING | $7,677 | $9,600 | Not Implemented |
BD0314 # 05 Y:2006 | 05 | 2006 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $1,824 | $1,200 | Not Implemented |
BD0314 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,382 | $4,955 | Not Implemented |
BD0314 # 07 Y:2006 | 07 | 2006 | INSTALL OCCUPANCY SENSORS | $1,221 | $525 | Not Implemented |
BD0314 # 08 Y:2006 | 08 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $421 | $1,230 | Not Implemented |
AS0422 # 01 Y:2006 | 01 | 2006 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $562,419 | $119,490 | n/a |
AS0422 # 02 Y:2006 | 02 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $8,736 | $9,000 | n/a |
AS0422 # 03 Y:2006 | 03 | 2006 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,763 | $33,120 | n/a |
AS0422 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $231 | $13,918 | n/a |
AS0422 # 05 Y:2006 | 05 | 2006 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,824 | $0 | n/a |
AM0510 # 01 Y:2006 | 01 | 2006 | INSTALL SKYLIGHTS | $19,700 | $45,100 | Not Implemented |
AM0510 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,610 | $8,000 | Implemented |
AM0510 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,980 | $700 | Implemented |
AM0510 # 04 Y:2006 | 04 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $2,930 | $0 | Implemented |
AM0510 # 05 Y:2006 | 05 | 2006 | RECOVER AND REUSE WASTE MATERIAL | $2,290 | $0 | Implemented |
AM0510 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,290 | $100 | Implemented |