IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

150

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2403 # 02 Y:2024 02 2024 INSTALL TIMERS AND/OR THERMOSTATS $1,928 $25 Implemented
LS2403 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,306 $3,600 Implemented
LS2403 # 04 Y:2024 04 2024 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $1,205 $950 Implemented
LS2403 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,116 $25 Not Implemented
LT8374 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,966 $9,823 n/a
LT8374 # 03 Y:2023 03 2023 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $30,878 $16,400 n/a
LT8374 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $24,154 $0 n/a
LT8374 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $96 $350 n/a
LS2217 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,436 $360 Implemented
LS2217 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,079 $50 Not Implemented
LS2217 # 05 Y:2022 05 2022 USE PHOTOCELL CONTROLS $797 $703 Not Implemented
LS2217 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $198 $338 Implemented
LS2217 # 03 Y:2022 03 2022 INSTALL TIMERS AND/OR THERMOSTATS $561 $100 Not Implemented
LS2217 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,897 $1,010 Implemented
LS2202 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,320 $900 Not Implemented
LS2202 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $448 $200 Not Implemented
LS2202 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,397 $100 Not Implemented
LS2202 # 04 Y:2022 04 2022 USE PHOTOCELL CONTROLS $2,098 $555 Not Implemented
LS2202 # 06 Y:2022 06 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $478 $300 Not Implemented
LS2202 # 08 Y:2022 08 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $25,733 $189,000 Not Implemented
LS2202 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,379 $6,434 Not Implemented
LS2202 # 09 Y:2022 09 2022 OPTIMIZE PLANT POWER FACTOR $12,415 $106,570 Not Implemented
LS2202 # 10 Y:2022 10 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $46,737 $646,020 Not Implemented
LS2202 # 01 Y:2022 01 2022 INSTALL TIMERS AND/OR THERMOSTATS $6,914 $63 Not Implemented
LS2201 # 07 Y:2022 07 2022 USE TANKS WITH A CONICAL BOTTOM OUTLET SECTION TO REDUCE WASTE ASSOCIATED WITH THE INTERFACE OF TWO LIQUIDS $1,451 $1,103 Not Implemented