IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

112

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0066 # 02 Y:2025 02 2025 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $762 $362 n/a
MU0066 # 01 Y:2025 01 2025 TURN OFF EQUIPMENT WHEN NOT IN USE $226 $0 n/a
MU0066 # 09 Y:2025 09 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $59,971 $561,792 n/a
MU0066 # 08 Y:2025 08 2025 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $116 $193 n/a
MU0066 # 07 Y:2025 07 2025 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $251 $242 n/a
MU0066 # 06 Y:2025 06 2025 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,303 $4,440 n/a
MU0066 # 05 Y:2025 05 2025 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $189 $627 n/a
MU0066 # 04 Y:2025 04 2025 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $49,773 $560,225 n/a
MU0066 # 03 Y:2025 03 2025 USE PHOTOCELL CONTROLS $302 $550 n/a
UD0980 # 10 Y:2018 10 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $61,867 $133,500 Not Implemented
UD0980 # 05 Y:2018 05 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $10,759 $1,000 Not Implemented
UD0980 # 08 Y:2018 08 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,597 $500 Not Implemented
UD0980 # 03 Y:2018 03 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,705 $0 Not Implemented
UD0980 # 02 Y:2018 02 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,299 $0 Not Implemented
UD0980 # 11 Y:2018 11 2018 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,108 $0 Not Implemented
UD0980 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,210 $0 Not Implemented
UD0980 # 07 Y:2018 07 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,657 $3,000 Not Implemented
UD0980 # 09 Y:2018 09 2018 REDUCE VENTILATION AIR $5,494 $3,000 Not Implemented
UD0980 # 12 Y:2018 12 2018 INSTALL OCCUPANCY SENSORS $1,285 $700 Not Implemented
UD0980 # 04 Y:2018 04 2018 COMBINE UTILITY METERS $123,816 $0 Not Implemented
UD0980 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $15,954 $0 Not Implemented
UM0452 # 03 Y:2015 03 2015 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $28,779 $28,000 Implemented
UM0452 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,871 $1,000 Not Implemented
UM0452 # 02 Y:2015 02 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,393 $2,500 Implemented
UM0452 # 04 Y:2015 04 2015 RECOVER WASTE HEAT FROM EQUIPMENT $2,903 $4,000 Implemented