Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
54
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0062 # 04 Y:1982 | 04 | 1982 | INSTALL TIMERS AND/OR THERMOSTATS | $909 | $599 | Implemented |
OK0062 # 01 Y:1982 | 01 | 1982 | INSULATE BARE EQUIPMENT | $82 | $450 | Implemented |
OK0062 # 02 Y:1982 | 02 | 1982 | USE MINIMUM SAFE OVEN VENTILATION | $1,749 | $0 | Implemented |
OK0062 # 03 Y:1982 | 03 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $337 | $285 | Implemented |
OK0062 # 05 Y:1982 | 05 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $130 | $690 | Implemented |
UD0048 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,576 | $1,603 | Not Implemented |
UD0048 # 04 Y:1982 | 04 | 1982 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,992 | $1,000 | Not Implemented |
UD0048 # 02 Y:1982 | 02 | 1982 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $4,904 | $2,500 | Not Implemented |
UD0048 # 03 Y:1982 | 03 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $815 | $600 | Not Implemented |
KU0059 # 04 Y:1982 | 04 | 1982 | INSTALL TIMERS AND/OR THERMOSTATS | $1,570 | $250 | Not Implemented |
KU0059 # 05 Y:1982 | 05 | 1982 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,405 | $99 | Implemented |
KU0059 # 06 Y:1982 | 06 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $796 | $139 | Not Implemented |
KU0059 # 03 Y:1982 | 03 | 1982 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,363 | $120 | Implemented |
OK0047 # 01 Y:1982 | 01 | 1982 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,188 | $7,040 | Not Implemented |
KU0059 # 02 Y:1982 | 02 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,516 | $22,000 | Implemented |
OK0047 # 03 Y:1982 | 03 | 1982 | INSTALL TIMERS AND/OR THERMOSTATS | $417 | $300 | Not Implemented |
OK0047 # 02 Y:1982 | 02 | 1982 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,056 | $372 | Not Implemented |
KU0059 # 01 Y:1982 | 01 | 1982 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $21,854 | $500 | Not Implemented |
OK0047 # 04 Y:1982 | 04 | 1982 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $903 | $462 | Not Implemented |
OK0047 # 05 Y:1982 | 05 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $39,082 | $28,910 | Not Implemented |
TN0122 # 01 Y:1982 | 01 | 1982 | USE OPTIMUM TEMPERATURE | $1,593 | $0 | Not Implemented |
TN0122 # 02 Y:1982 | 02 | 1982 | COVER OPEN TANKS | $467 | $900 | Not Implemented |
TN0122 # 04 Y:1982 | 04 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $481 | $82 | Not Implemented |
TN0122 # 03 Y:1982 | 03 | 1982 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $663 | $800 | Not Implemented |
OK0045 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $150 | $147 | Not Implemented |