Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
99
matching recommendationsSIC | 344 | Fabricated Structural Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0182 # 07 Y:1985 | 07 | 1985 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,516 | $2,500 | Implemented |
UD0182 # 05 Y:1985 | 05 | 1985 | USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC | $2,860 | $1,300 | Not Implemented |
UD0182 # 04 Y:1985 | 04 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,277 | $50,700 | Not Implemented |
UD0182 # 06 Y:1985 | 06 | 1985 | MINIMIZE WATER USAGE | $38,577 | $4,000 | Implemented |
UD0182 # 03 Y:1985 | 03 | 1985 | COVER OPEN TANKS | $8,435 | $1,100 | Implemented |
UD0182 # 02 Y:1985 | 02 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,436 | $0 | Implemented |
UD0182 # 01 Y:1985 | 01 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $153,020 | $24,416 | Implemented |
ST0044 # 09 Y:1985 | 09 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $247 | $110 | Not Implemented |
TS0029 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,514 | $2,892 | Not Implemented |
UD0175 # 01 Y:1985 | 01 | 1985 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $25,286 | $48,000 | Implemented |
ST0044 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,000 | $774 | Not Implemented |
ST0044 # 03 Y:1985 | 03 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $453 | $30 | Not Implemented |
TS0029 # 01 Y:1985 | 01 | 1985 | OPTIMIZE PLANT POWER FACTOR | $65,767 | $60,000 | Not Implemented |
TS0028 # 03 Y:1985 | 03 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $811 | $300 | Not Implemented |
ST0044 # 08 Y:1985 | 08 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $221 | $390 | Not Implemented |
TS0028 # 01 Y:1985 | 01 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,831 | $0 | Not Implemented |
ST0044 # 11 Y:1985 | 11 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $294 | $182 | Not Implemented |
ST0044 # 10 Y:1985 | 10 | 1985 | INSTALL STORM WINDOWS AND DOORS | $225 | $400 | Not Implemented |
ST0044 # 07 Y:1985 | 07 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $496 | $1,100 | Not Implemented |
ST0044 # 06 Y:1985 | 06 | 1985 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $110 | $90 | Not Implemented |
ST0044 # 05 Y:1985 | 05 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $231 | $0 | Implemented |
ST0044 # 04 Y:1985 | 04 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $967 | $0 | Implemented |
ST0044 # 02 Y:1985 | 02 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,595 | $100 | Not Implemented |
TS0029 # 02 Y:1985 | 02 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,874 | $100 | Not Implemented |
TS0028 # 02 Y:1985 | 02 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,428 | $0 | Not Implemented |