IAC Assessment: UD0182
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0182
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1985
Principal Product VALVES,BLOWERS,HEAT EXCHANGERS
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $10,000,000-$50,000,000
# of Employees 400
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 3,840
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $544,646 8,643,904 kWh $0.06
Natural Gas $195,632 35,414 MMBtu $5.52
TOTAL ENERGY COSTS $740,278
RECOMMENDED SAVINGS* $233,121 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $211,984
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$153,020
Cost:
$24,416
$138,691 2,842,321 $10,753 1,948 $3,576 - $138,691
2,842,321
kWh
$10,753
1,948
MMBtu
$3,576
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$8,436
Cost:
-
$8,436 - - - - - $8,436
-
kWh
-
-
MMBtu
-
-
$
03: 2.2514 COVER OPEN TANKS Savings:
$8,435
Cost:
$1,100
- - $8,435 1,528 - - -
-
kWh
$8,435
1,528
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,277
Cost:
$50,700
$23,068 381,594 $(-4,791) (-868) - - $23,068
381,594
kWh
$(-4,791)
(-868)
MMBtu
-
-
$
05: 2.2221 USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC Savings:
$2,860
Cost:
$1,300
$(-2,620) (-99,648) $5,480 993 - - $(-2,620)
(-99,648)
kWh
$5,480
993
MMBtu
-
-
$
06: 3.4151 MINIMIZE WATER USAGE Savings:
$38,577
Cost:
$4,000
- - - - $38,577 - -
-
kWh
-
-
MMBtu
$38,577
-
$
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,516
Cost:
$2,500
- - $3,516 637 - - -
-
kWh
$3,516
637
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$233,121
Cost:
$84,016
$167,575 3,124,267 $23,393 4,238 $42,153 - $167,575
3,124,267
kWh
$23,393
4,238
MMBtu
$42,153
-
$
TOTAL IMPLEMENTED Savings:
$211,984
Cost:
$32,016
$147,127 2,842,321 $22,704 4,113 $42,153 - $147,127
2,842,321
kWh
$22,704
4,113
MMBtu
$42,153
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes