IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

53

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0062 # 04 Y:1989 04 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,647 $0 Not Implemented
WI0062 # 01 Y:1989 01 1989 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $12,224 $0 Not Implemented
WI0062 # 07 Y:1989 07 1989 INSTALL STORM WINDOWS AND DOORS $959 $2,090 Not Implemented
WI0062 # 06 Y:1989 06 1989 IMPROVE LUBRICATION PRACTICES $1,320 $0 Not Implemented
WI0062 # 02 Y:1989 02 1989 INSTALL TIMERS AND/OR THERMOSTATS $4,059 $3,500 Implemented
WI0062 # 05 Y:1989 05 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,596 $6,000 Implemented
WI0062 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $709 $2,290 Implemented
OK0284 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $289 $275 Implemented
OK0284 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,250 $3,808 Implemented
OK0284 # 07 Y:1989 07 1989 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,197 $31,028 Implemented
OK0284 # 09 Y:1989 09 1989 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS $1,525 $0 Implemented
OK0284 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $400 $825 Implemented
OK0284 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,480 $36,560 Implemented
OK0284 # 06 Y:1989 06 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $560 $3,432 Implemented
OK0284 # 08 Y:1989 08 1989 RECOVER WASTE HEAT FROM EQUIPMENT $6,816 $2,140 Implemented
OK0284 # 01 Y:1989 01 1989 INSTALL TIMERS AND/OR THERMOSTATS $738 $1,250 Implemented
AM0059 # 09 Y:1989 09 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $110 $0 Implemented
AM0059 # 08 Y:1989 08 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $166 $340 Implemented
AM0059 # 07 Y:1989 07 1989 IMPROVE LUBRICATION PRACTICES $227 $0 Not Implemented
AM0059 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,105 $2,176 Implemented
AM0059 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,382 $300 Implemented
AM0059 # 03 Y:1989 03 1989 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $845 $840 Not Implemented
AM0059 # 04 Y:1989 04 1989 RECOVER WASTE HEAT FROM EQUIPMENT $495 $1,000 Not Implemented
AM0059 # 05 Y:1989 05 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $325 $0 Implemented
AM0059 # 06 Y:1989 06 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $62 $15 Implemented