IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

150

matching recommendations
Reset
SIC 344 Fabricated Structural Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0417 # 05 Y:1993 05 1993 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $922 $790 Implemented
OK0417 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,331 $180 Implemented
OK0417 # 08 Y:1993 08 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $767 $0 Implemented
OK0417 # 07 Y:1993 07 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $827 $946 Implemented
OK0417 # 02 Y:1993 02 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,551 $0 Not Implemented
OK0417 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $833 $2,567 Not Implemented
OK0417 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,614 $5,045 Implemented
OK0417 # 04 Y:1993 04 1993 INSTALL SET-BACK TIMERS $1,428 $1,200 Implemented
OK0417 # 09 Y:1993 09 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $447 $0 Implemented
MO0100 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,300 $359 Implemented
MO0100 # 04 Y:1993 04 1993 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $2,116 $2,300 Not Implemented
MO0100 # 03 Y:1993 03 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,336 $1,158 Implemented
MO0100 # 10 Y:1993 10 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,060 $790 Implemented
MO0100 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $288 $496 Not Implemented
MO0100 # 05 Y:1993 05 1993 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $486 $50 Implemented
MO0100 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,826 $8,080 Implemented
MO0100 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,010 $9,429 Implemented
MO0100 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $740 $130 Implemented
MO0100 # 09 Y:1993 09 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,723 $50 Implemented
KU0413 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $682 $113 Implemented
KU0413 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $975 $11,826 Not Implemented
KU0413 # 02 Y:1993 02 1993 ADD AREA LIGHTING SWITCHES $1,193 $3,969 Not Implemented
KU0413 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,240 $429 Implemented
KU0413 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $293 $200 Implemented
KU0409 # 01 Y:1993 01 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,324 $264 Implemented