IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,107

matching recommendations
Reset
SIC 3441 Fabricated Structural Metal
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0336 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $595 $580 Implemented
MA0336 # 04 Y:1995 04 1995 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $582 $0 Implemented
MA0336 # 05 Y:1995 05 1995 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $461 $0 Implemented
CO0318 # 01 Y:1994 01 1994 REDUCE OR ELIMINATE WASTE $27,620 $15,000 Not Implemented
CO0318 # 02 Y:1994 02 1994 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,830 $7,860 Implemented
CO0318 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $820 $820 Not Implemented
CO0318 # 04 Y:1994 04 1994 REMOVE ROLLERS FROM THE MACHINES AND CLEAN IN A CLOSED SOLVENT CLEANER $2,210 $1,750 Implemented
CO0318 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,590 $2,260 Implemented
CO0318 # 06 Y:1994 06 1994 USE PHOTOCELL CONTROLS $1,580 $3,000 Not Implemented
CO0318 # 07 Y:1994 07 1994 CONVERT TO AIR ASSISTED / AIRLESS PAINT GUNS $1,310 $1,300 Not Implemented
CO0318 # 08 Y:1994 08 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $880 $370 Implemented
CO0318 # 09 Y:1994 09 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $560 $960 Implemented
UF0089 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,347 $2,246 Not Implemented
UF0089 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,449 $1,820 Not Implemented
UF0089 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $534 $1,126 Not Implemented
UF0089 # 04 Y:1994 04 1994 INSTALL OCCUPANCY SENSORS $1,191 $320 Not Implemented
UF0089 # 05 Y:1994 05 1994 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,372 $1,940 Not Implemented
UF0089 # 06 Y:1994 06 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,008 $1,960 Not Implemented
UF0089 # 07 Y:1994 07 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,430 $750 Not Implemented
WI0197 # 01 Y:1994 01 1994 UPGRADE OBSOLETE EQUIPMENT $16,304 $30,000 Implemented
WI0197 # 02 Y:1994 02 1994 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $33,894 $500 Implemented
WI0197 # 03 Y:1994 03 1994 INSULATE BARE EQUIPMENT $6,277 $1,167 Not Implemented
WI0197 # 04 Y:1994 04 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,426 $200 Implemented
WI0197 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,431 $960 Implemented
WI0197 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,900 $2,741 Not Implemented