Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
18
matching recommendationsSIC | 3441 | Fabricated Structural Metal |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
RU0077 # 01 Y:1990 | 01 | 1990 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,686 | $102 | Implemented |
RU0077 # 02 Y:1990 | 02 | 1990 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,408 | $650 | Implemented |
RU0077 # 03 Y:1990 | 03 | 1990 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,140 | $5,700 | Not Implemented |
RU0077 # 04 Y:1990 | 04 | 1990 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $5,202 | $450 | Implemented |
RU0077 # 05 Y:1990 | 05 | 1990 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $1,560 | $340 | Not Implemented |
RU0007 # 02 Y:1987 | 02 | 1987 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,804 | $0 | Implemented |
RU0007 # 03 Y:1987 | 03 | 1987 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,720 | $5,000 | Implemented |
RU0007 # 04 Y:1987 | 04 | 1987 | IMPROVE LUBRICATION PRACTICES | $455 | $0 | Implemented |
RU0007 # 01 Y:1987 | 01 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $774 | $180 | Implemented |
ST0032 # 09 Y:1985 | 09 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $503 | $380 | Not Implemented |
ST0032 # 08 Y:1985 | 08 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $380 | $1,140 | Not Implemented |
ST0032 # 07 Y:1985 | 07 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $305 | $0 | Not Implemented |
ST0032 # 06 Y:1985 | 06 | 1985 | REPLACE DC EQUIPMENT WITH AC EQUIPMENT | $2,416 | $5,000 | Not Implemented |
ST0032 # 05 Y:1985 | 05 | 1985 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $1,974 | $900 | Not Implemented |
ST0032 # 04 Y:1985 | 04 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $890 | $1,900 | Implemented |
ST0032 # 03 Y:1985 | 03 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,640 | $688 | Not Implemented |
ST0032 # 02 Y:1985 | 02 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $72 | $42 | Not Implemented |
ST0032 # 01 Y:1985 | 01 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $514 | $64 | Implemented |