IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
SIC 3441 Fabricated Structural Metal
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KG0045 # 05 Y:1995 05 1995 USE SYNTHETIC LUBRICANT $3,548 $0 Implemented
KG0045 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,347 $390 Not Implemented
KG0045 # 03 Y:1995 03 1995 INSTALL TIMERS AND/OR THERMOSTATS $4,737 $600 Not Implemented
KG0045 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,861 $2,995 Implemented
KG0045 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,012 $11,560 Implemented
AR0066 # 02 Y:1995 02 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $28,580 $10,560 Implemented
AR0066 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,497 $489 Implemented
AR0066 # 07 Y:1995 07 1995 USE RADIANT HEATER FOR SPOT HEATING $14,927 $18,400 Implemented
AR0066 # 06 Y:1995 06 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,719 $0 Implemented
AR0066 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,947 $13,110 Implemented
AR0066 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,221 $500 Implemented
AR0066 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,030 $100 Implemented
UD0466 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $816 $960 Not Implemented
UD0466 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,108 $1,530 Not Implemented
UD0466 # 02 Y:1995 02 1995 RECOVER WASTE HEAT FROM EQUIPMENT $2,867 $3,000 Not Implemented
UD0466 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $627 $1,000 Not Implemented
UD0466 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,117 $640 Not Implemented
KG0032 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,023 $8,710 Not Implemented
KG0032 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,180 $600 Implemented
KG0032 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,008 $383 Implemented
KG0032 # 04 Y:1995 04 1995 INSTALL TIMERS AND/OR THERMOSTATS $1,002 $600 Not Implemented
KG0032 # 05 Y:1995 05 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $636 $20 Not Implemented
ME0165 # 06 Y:1995 06 1995 RECOVER WASTE HEAT FROM EQUIPMENT $435 $930 Not Implemented
ME0165 # 10 Y:1995 10 1995 SELL COMBUSTIBLE WASTE $2,000 $0 Not Implemented
ME0165 # 09 Y:1995 09 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,940 $300 Implemented