IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

587

matching recommendations
Reset
SIC 3443 Fabricated Plate Work (boiler Shops)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0172 # 04 Y:1985 04 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $546 $0 Implemented
GT0248 # 01 Y:1985 01 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $722 $581 Implemented
GT0248 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,090 $222 Implemented
GT0248 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $937 $125 Implemented
GT0248 # 05 Y:1985 05 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,875 $500 Implemented
GT0248 # 06 Y:1985 06 1985 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $97,891 $0 Implemented
MA0012 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,078 $100 Implemented
MA0012 # 02 Y:1984 02 1984 INSULATE BARE EQUIPMENT $40 $25 Implemented
MA0012 # 03 Y:1984 03 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $422 $550 Implemented
TS0001 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,951 $16,300 Implemented
TS0001 # 03 Y:1984 03 1984 USE MINIMUM SAFE OVEN VENTILATION $335 $300 Implemented
TS0001 # 04 Y:1984 04 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $169 $200 Implemented
TS0002 # 01 Y:1984 01 1984 INSTALL SET-BACK TIMERS $2,178 $0 Implemented
TS0002 # 03 Y:1984 03 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $813 $1,310 Implemented
OK0124 # 01 Y:1984 01 1984 INSTALL TIMERS AND/OR THERMOSTATS $5,465 $650 Implemented
OK0124 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $130 $30 Implemented
OK0124 # 03 Y:1984 03 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,730 $256 Implemented
OK0124 # 04 Y:1984 04 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $56 $0 Implemented
OK0124 # 05 Y:1984 05 1984 RECOVER WASTE HEAT FROM EQUIPMENT $218 $516 Implemented
OK0124 # 06 Y:1984 06 1984 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $64 $485 Implemented
OK0127 # 01 Y:1984 01 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $344 $434 Implemented
OK0127 # 02 Y:1984 02 1984 INSTALL TIMERS AND/OR THERMOSTATS $744 $0 Implemented
OK0127 # 04 Y:1984 04 1984 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $367 $0 Implemented
UD0117 # 03 Y:1984 03 1984 INSTALL STORM WINDOWS AND DOORS $18,493 $22,385 Implemented
UD0117 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,694 $0 Implemented