IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
SIC 3443 Fabricated Plate Work (boiler Shops)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0159 # 06 Y:1996 06 1996 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $2,469 $7,000 Not Implemented
UF0159 # 05 Y:1996 05 1996 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $3,227 $0 Not Implemented
UF0159 # 04 Y:1996 04 1996 CONTRACT A WOOD PALLET RECYCLING COMPANY $8,700 $0 Not Implemented
UF0159 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,236 $1,350 Implemented
UF0159 # 02 Y:1996 02 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $163 $389 Implemented
UF0159 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,087 $20,164 Implemented
GT0546 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $290 $450 Not Implemented
GT0546 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $700 $4,140 Not Implemented
GT0546 # 03 Y:1994 03 1994 ADJUST BURNERS FOR EFFICIENT OPERATION $3,540 $500 Not Implemented
GT0546 # 02 Y:1994 02 1994 RECOVER WASTE HEAT FROM EQUIPMENT $2,580 $5,030 Not Implemented
GT0546 # 01 Y:1994 01 1994 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $47,900 $33,800 Not Implemented
GT0539 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,360 $400 Implemented
GT0539 # 04 Y:1994 04 1994 ISOLATE HOT OR COLD EQUIPMENT $21,350 $34,500 Not Implemented
GT0539 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,060 $5,550 Implemented
GT0539 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $410 $2,445 Implemented
GT0248 # 07 Y:1985 07 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,990 $12,500 Not Implemented
GT0248 # 06 Y:1985 06 1985 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $97,891 $0 Implemented
GT0248 # 05 Y:1985 05 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,875 $500 Implemented
GT0248 # 04 Y:1985 04 1985 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,830 $7,000 Not Implemented
GT0248 # 03 Y:1985 03 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $937 $125 Implemented
GT0248 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,090 $222 Implemented
GT0248 # 01 Y:1985 01 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $722 $581 Implemented
GT0160 # 01 Y:1983 01 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,346 $15,332 Not Implemented
GT0160 # 06 Y:1983 06 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,127 $6,290 Not Implemented
GT0160 # 05 Y:1983 05 1983 INSTALL TIMERS AND/OR THERMOSTATS $2,490 $2,000 Not Implemented