IAC Assessment: GT0160
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0160
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1983
Principal Product TANKS & PRESSURE VESSELS
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $5,000,000-$10,000,000
# of Employees 75
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 2,080
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $105,232 1,427,902 kWh $0.07
Natural Gas $15,516 3,704 MMBtu $4.19
TOTAL ENERGY COSTS $120,748
RECOMMENDED SAVINGS* $15,598 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,346
Cost:
$15,332
$2,346 31,946 - - $2,346
31,946
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,103
Cost:
-
$2,103 28,429 - - $2,103
28,429
kWh
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,127
Cost:
-
$3,127 42,497 - - $3,127
42,497
kWh
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,405
Cost:
$125
$2,405 32,532 - - $2,405
32,532
kWh
-
-
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,490
Cost:
$2,000
- - $2,490 612 -
-
kWh
$2,490
612
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,127
Cost:
$6,290
$3,127 42,497 - - $3,127
42,497
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$15,598
Cost:
$23,747
$13,108 177,901 $2,490 612 $13,108
177,901
kWh
$2,490
612
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas