Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
32
matching recommendationsSIC | 3443 | Fabricated Plate Work (boiler Shops) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0255 # 12 Y:2007 | 12 | 2007 | OPTIMIZE PLANT POWER FACTOR | $563 | $3,344 | Not Implemented |
SU0255 # 06 Y:2007 | 06 | 2007 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $8,489 | $4,993 | Not Implemented |
SU0255 # 05 Y:2007 | 05 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,293 | $1,300 | Implemented |
SU0255 # 04 Y:2007 | 04 | 2007 | USE SYNTHETIC LUBRICANT | $336 | $0 | Not Implemented |
SU0255 # 03 Y:2007 | 03 | 2007 | $765 | $0 | Implemented | |
SU0255 # 02 Y:2007 | 02 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,004 | $0 | Implemented |
SU0255 # 01 Y:2007 | 01 | 2007 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $9,744 | $0 | Implemented |
SU0255 # 09 Y:2007 | 09 | 2007 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,084 | $5,590 | Not Implemented |
SU0255 # 10 Y:2007 | 10 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,025 | $32,224 | Not Implemented |
SU0255 # 08 Y:2007 | 08 | 2007 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $14,202 | $19,571 | Not Implemented |
SU0255 # 11 Y:2007 | 11 | 2007 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $269 | $727 | Not Implemented |
SU0255 # 07 Y:2007 | 07 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $331 | $237 | Not Implemented |
MZ0004 # 03 Y:2007 | 03 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,707 | $1,300 | Not Implemented |
MZ0004 # 01 Y:2007 | 01 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,138 | $2,230 | Implemented |
MZ0004 # 09 Y:2007 | 09 | 2007 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $4,600 | $0 | Implemented |
MZ0004 # 08 Y:2007 | 08 | 2007 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $56,125 | $0 | Not Implemented |
MZ0004 # 07 Y:2007 | 07 | 2007 | INSTALL OCCUPANCY SENSORS | $6,900 | $2,950 | Not Implemented |
MZ0004 # 06 Y:2007 | 06 | 2007 | DISCONNECT BALLASTS | $19,720 | $1,050 | Not Implemented |
MZ0004 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,950 | $24,700 | Not Implemented |
MZ0004 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $184 | $150 | Implemented |
MZ0004 # 02 Y:2007 | 02 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $18,457 | $3,412 | Not Implemented |
OK0744 # 01 Y:2007 | 01 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,427 | $8,720 | Not Implemented |
OK0744 # 02 Y:2007 | 02 | 2007 | USE RADIANT HEATER FOR SPOT HEATING | $34,603 | $3,729 | Not Implemented |
OK0744 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,080 | $360 | Not Implemented |
OK0744 # 04 Y:2007 | 04 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,247 | $2,398 | Not Implemented |