IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,512

matching recommendations
Reset
SIC 3444 Sheet Metalwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0415 # 08 Y:2016 08 2016 ADD AREA LIGHTING SWITCHES $4,550 $12,000 Not Implemented
LE0415 # 09 Y:2016 09 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $17,395 $67,000 Implemented
LE0415 # 10 Y:2016 10 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,733 $7,800 Not Implemented
UD0945 # 01 Y:2016 01 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $5,063 $8,000 Implemented
UD0945 # 02 Y:2016 02 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $527 $0 Implemented
UD0945 # 03 Y:2016 03 2016 REDUCE FLUID FLOW RATES $7,163 $0 Implemented
UD0945 # 04 Y:2016 04 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $623 $30 Implemented
UD0945 # 05 Y:2016 05 2016 REDUCE VENTILATION AIR $77,225 $18,850 Not Implemented
UD0945 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,486 $8,972 Not Implemented
UD0945 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,610 $0 Not Implemented
UD0945 # 08 Y:2016 08 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,209 $3,951 Not Implemented
UD0945 # 09 Y:2016 09 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,501 $0 Not Implemented
UD0945 # 10 Y:2016 10 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $24,904 $23,828 Not Implemented
UD0945 # 11 Y:2016 11 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,976 $0 Implemented
UD0945 # 12 Y:2016 12 2016 DEVELOP A REPAIR/REPLACE POLICY $3,983 $20,370 Implemented
UD0945 # 13 Y:2016 13 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,867 $300 Not Implemented
UD0945 # 14 Y:2016 14 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $756 $300 Not Implemented
UA0154 # 01 Y:2016 01 2016 MODIFY STARTUP/SHUTDOWN TIMES $3,959 $0 Not Implemented
UA0154 # 02 Y:2016 02 2016 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $1,116 $1,660 Not Implemented
UA0154 # 03 Y:2016 03 2016 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $201 $508 Not Implemented
UA0154 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $566 $2,045 Not Implemented
UA0154 # 05 Y:2016 05 2016 USE PHOTOCELL CONTROLS $414 $664 Not Implemented
UA0154 # 06 Y:2016 06 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $175 $120 Not Implemented
LE0407 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $143 $0 Not Implemented
LE0407 # 02 Y:2016 02 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $19,792 $25 Implemented