IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

129

matching recommendations
Reset
SIC 3444 Sheet Metalwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0346 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $908 $5,504 Implemented
UF0346 # 04 Y:2004 04 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $942 $210 Implemented
UF0346 # 05 Y:2004 05 2004 CONVERT TO ROBOTIC PAINTING $24,976 $124,000 Not Implemented
MI0064 # 01 Y:2003 01 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,766 $3,951 Not Implemented
MI0064 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $287 $24 Implemented
MI0064 # 03 Y:2003 03 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $233 $458 Not Implemented
MI0064 # 04 Y:2003 04 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $57,321 $6,188 Implemented
MI0064 # 05 Y:2003 05 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,458 $32,500 Not Implemented
MI0064 # 06 Y:2003 06 2003 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $1,223 $9 Implemented
UF0280 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,550 $410 Implemented
UF0280 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,615 $7,198 Implemented
UF0280 # 03 Y:2001 03 2001 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $15,000 $50 Implemented
UF0280 # 04 Y:2001 04 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $11,751 $25,263 Not Implemented
UF0280 # 05 Y:2001 05 2001 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $9,972 $20,010 Not Implemented
UF0280 # 06 Y:2001 06 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,427 $8,000 Implemented
UF0280 # 07 Y:2001 07 2001 RECOVER AND REUSE WASTE MATERIAL $1,867 $534 Not Implemented
UF0280 # 08 Y:2001 08 2001 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $117,000 $120,250 Not Implemented
UF0280 # 09 Y:2001 09 2001 $14,321 $4,612 Implemented
MI0009 # 01 Y:2001 01 2001 INSTALL SPECTRAL REFLECTORS / DELAMP $14,580 $5,000 Not Implemented
MI0009 # 02 Y:2001 02 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,327 $12 Not Implemented
MI0009 # 03 Y:2001 03 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,745 $12 Not Implemented
MI0009 # 04 Y:2001 04 2001 $43,740 $2,550 Not Implemented
MI0009 # 05 Y:2001 05 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,083 $1,102 Not Implemented
MI0007 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,671 $281 Implemented
MI0007 # 02 Y:2001 02 2001 $138,240 $32,000 Implemented