IAC logo
IAC Assessment: UF0280
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0280
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2001
Principal Product Truck Accessories
NAICS n/a
SIC 3444 - Sheet Metalwork
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 185,000
Annual Production 24,000 Pieces
Production Hrs. Annual 5,304
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $43,083 1,263,760 kWh $0.03
Electricity Demand $20,493 4,494 kW-months/year $4.56
TOTAL ENERGY COSTS $63,576
RECOMMENDED SAVINGS* $182,503 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $41,913
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Primary Product Increase in Production Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Primary Product Increase in Production
$ kWh $ kW-months/year $ lb $ $ $ $ $ %
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,550
Cost:
$410
$1,604 30,258 - - - - $(-54) - - - - - $1,604
30,258
kWh
-
-
kW-months/year
-
-
lb
$(-54)
-
$
-
-
$
-
-
%
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,615
Cost:
$7,198
$6,815 189,304 $1,800 33 - - - - - - - - $6,815
189,304
kWh
$1,800
33
kW-months/year
-
-
lb
-
-
$
-
-
$
-
-
%
03: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$15,000
Cost:
$50
- - - - - - $15,000 - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$15,000
-
$
-
-
$
-
-
%
04: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$11,751
Cost:
$25,263
$12,001 226,440 - - - - $(-250) - - - - - $12,001
226,440
kWh
-
-
kW-months/year
-
-
lb
$(-250)
-
$
-
-
$
-
-
%
05: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$9,972
Cost:
$20,010
$3,774 104,825 $2,358 43 - - - - $3,840 - - - $3,774
104,825
kWh
$2,358
43
kW-months/year
-
-
lb
-
-
$
$3,840
-
$
-
-
%
06: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$2,427
Cost:
$8,000
- - - - $2,427 - - - - - - - -
-
kWh
-
-
kW-months/year
$2,427
-
lb
-
-
$
-
-
$
-
-
%
07: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$1,867
Cost:
$534
- - - - $1,867 - - - - - - - -
-
kWh
-
-
kW-months/year
$1,867
-
lb
-
-
$
-
-
$
-
-
%
08: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$117,000
Cost:
$120,250
- - - - - - - - - - $117,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
$117,000
-
%
09: 4.4480 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM Savings:
$14,321
Cost:
$4,612
- - - - - - $14,321 - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$14,321
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$182,503
Cost:
$186,327
$24,194 550,827 $4,158 76 $4,294 - $29,017 - $3,840 - $117,000 - $24,194
550,827
kWh
$4,158
76
kW-months/year
$4,294
-
lb
$29,017
-
$
$3,840
-
$
$117,000
-
%
TOTAL IMPLEMENTED Savings:
$41,913
Cost:
$20,270
$8,419 219,562 $1,800 33 $2,427 - $29,267 - - - - - $8,419
219,562
kWh
$1,800
33
kW-months/year
$2,427
-
lb
$29,267
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $ $ %
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Primary Product Increase in Production Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Primary Product Increase in Production