IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,504

matching recommendations
Reset
SIC 3444 Sheet Metalwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0180 # 02 Y:2020 02 2020 INSTALL TIMERS AND/OR THERMOSTATS $980 $120 Implemented
DL0180 # 03 Y:2020 03 2020 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $1,450 $400 Implemented
DL0180 # 04 Y:2020 04 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,160 $1,600 Not Implemented
DL0180 # 05 Y:2020 05 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,970 $5,800 Not Implemented
DL0180 # 06 Y:2020 06 2020 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,050 $4,000 Not Implemented
DL0180 # 07 Y:2020 07 2020 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $53,460 $2,400 Not Implemented
DL0180 # 08 Y:2020 08 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,080 $1,900 Implemented
DL0180 # 09 Y:2020 09 2020 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $610 $900 Implemented
MZ0251 # 01 Y:2018 01 2018 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $22,536 $32,400 Not Implemented
MZ0251 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $688 $75 Implemented
MZ0251 # 03 Y:2018 03 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $862 $1,160 Implemented
MZ0251 # 04 Y:2018 04 2018 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $6,719 $36,000 Not Implemented
MZ0251 # 05 Y:2018 05 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,018 $0 Implemented
MZ0251 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,153 $6,140 Implemented
UD0980 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $15,954 $0 Not Implemented
UD0980 # 02 Y:2018 02 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,299 $0 Not Implemented
UD0980 # 03 Y:2018 03 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,705 $0 Not Implemented
UD0980 # 04 Y:2018 04 2018 COMBINE UTILITY METERS $123,816 $0 Not Implemented
UD0980 # 05 Y:2018 05 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $10,759 $1,000 Not Implemented
UD0980 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,210 $0 Not Implemented
UD0980 # 07 Y:2018 07 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,657 $3,000 Not Implemented
UD0980 # 08 Y:2018 08 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,597 $500 Not Implemented
UD0980 # 09 Y:2018 09 2018 REDUCE VENTILATION AIR $5,494 $3,000 Not Implemented
UD0980 # 10 Y:2018 10 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $61,867 $133,500 Not Implemented
UD0980 # 11 Y:2018 11 2018 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $5,108 $0 Not Implemented