Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsSIC | 3444 | Sheet Metalwork |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0066 # 02 Y:2025 | 02 | 2025 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $762 | $362 | n/a |
MU0066 # 03 Y:2025 | 03 | 2025 | USE PHOTOCELL CONTROLS | $302 | $550 | n/a |
MU0066 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $49,773 | $560,225 | n/a |
MU0066 # 05 Y:2025 | 05 | 2025 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $189 | $627 | n/a |
MU0066 # 06 Y:2025 | 06 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,303 | $4,440 | n/a |
MU0066 # 07 Y:2025 | 07 | 2025 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $251 | $242 | n/a |
MU0066 # 08 Y:2025 | 08 | 2025 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $116 | $193 | n/a |
MU0066 # 09 Y:2025 | 09 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $59,971 | $561,792 | n/a |
MU0066 # 01 Y:2025 | 01 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $226 | $0 | n/a |
UD0980 # 04 Y:2018 | 04 | 2018 | COMBINE UTILITY METERS | $123,816 | $0 | Not Implemented |
UD0980 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $15,954 | $0 | Not Implemented |
UD0980 # 05 Y:2018 | 05 | 2018 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $10,759 | $1,000 | Not Implemented |
UD0980 # 06 Y:2018 | 06 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,210 | $0 | Not Implemented |
UD0980 # 07 Y:2018 | 07 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,657 | $3,000 | Not Implemented |
UD0980 # 08 Y:2018 | 08 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,597 | $500 | Not Implemented |
UD0980 # 09 Y:2018 | 09 | 2018 | REDUCE VENTILATION AIR | $5,494 | $3,000 | Not Implemented |
UD0980 # 10 Y:2018 | 10 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $61,867 | $133,500 | Not Implemented |
UD0980 # 11 Y:2018 | 11 | 2018 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $5,108 | $0 | Not Implemented |
UD0980 # 12 Y:2018 | 12 | 2018 | INSTALL OCCUPANCY SENSORS | $1,285 | $700 | Not Implemented |
UD0980 # 03 Y:2018 | 03 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,705 | $0 | Not Implemented |
UD0980 # 02 Y:2018 | 02 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,299 | $0 | Not Implemented |
UM0398 # 01 Y:2011 | 01 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,500 | $7,000 | Not Implemented |
UM0398 # 02 Y:2011 | 02 | 2011 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $8,496 | $10,350 | Not Implemented |
UM0398 # 03 Y:2011 | 03 | 2011 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,186 | $0 | Implemented |
UM0398 # 04 Y:2011 | 04 | 2011 | INSULATE BARE EQUIPMENT | $1,482 | $1,157 | Implemented |