IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
Reset
SIC 3444 Sheet Metalwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0845 # 05 Y:2011 05 2011 REDUCE HEAT GAIN BY WINDOW TINTING $533 $0 Not Implemented
UD0845 # 04 Y:2011 04 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $286 $1,500 Not Implemented
UD0845 # 03 Y:2011 03 2011 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $4,285 $4,000 Implemented
UD0845 # 02 Y:2011 02 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $534 $0 Implemented
UD0845 # 01 Y:2011 01 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $1,244 $500 Not Implemented
UM0398 # 05 Y:2011 05 2011 RECOVER WASTE HEAT FROM EQUIPMENT $3,477 $500 Implemented
UM0398 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $1,482 $1,157 Implemented
UM0398 # 03 Y:2011 03 2011 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,186 $0 Implemented
UM0398 # 02 Y:2011 02 2011 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $8,496 $10,350 Not Implemented
UM0398 # 01 Y:2011 01 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,500 $7,000 Not Implemented
NC0433 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,215 $1,403 Implemented
NC0433 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $81,541 $230,949 Implemented
NC0433 # 03 Y:2011 03 2011 RECOVER WASTE HEAT FROM EQUIPMENT $7,463 $10,818 Not Implemented
NC0433 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,299 $50 Implemented
NC0433 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,334 $100 Implemented
NC0433 # 08 Y:2011 08 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $276 $0 Not Implemented
NC0433 # 07 Y:2011 07 2011 DEVELOP A REPAIR/REPLACE POLICY $2,159 $3,999 Implemented
NC0433 # 06 Y:2011 06 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $17,685 $29,025 Not Implemented
UD0831 # 01 Y:2011 01 2011 USE SOLAR HEAT TO MAKE ELECTRICTY $28,448 $196,170 Not Implemented
UD0831 # 02 Y:2011 02 2011 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $7,067 $25,796 Not Implemented
UD0831 # 03 Y:2011 03 2011 INSTALL SPECTRAL REFLECTORS / DELAMP $4,392 $3,863 Implemented
UD0831 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $713 $10,495 Implemented
UD0831 # 05 Y:2011 05 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,848 $12,100 Not Implemented
UD0831 # 06 Y:2011 06 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $904 $1,167 Not Implemented
UD0831 # 07 Y:2011 07 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $189 $240 Implemented