Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

437

matching recommendations
Reset
SIC 345 Screw Machine Products, Bolts, Etc.
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0078 # 05 Y:1996 05 1996 RECOVER WASTE HEAT FROM EQUIPMENT $1,702 $630 Implemented
WV0078 # 06 Y:1996 06 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,506 $1,200 Implemented
HO0123 # 01 Y:1995 01 1995 ADD AREA LIGHTING SWITCHES $2,534 $200 Implemented
HO0123 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,424 $10,340 Implemented
HO0123 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,559 $600 Implemented
AS0148 # 03 Y:1995 03 1995 USE SYNTHETIC LUBRICANT $542 $279 Implemented
AS0148 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $540 $600 Implemented
AS0148 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,473 $7,071 Implemented
AS0148 # 06 Y:1995 06 1995 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $385 $750 Implemented
AS0148 # 07 Y:1995 07 1995 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $476 $2,100 Implemented
CO0316 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,280 $6,120 Implemented
CO0316 # 05 Y:1994 05 1994 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $5,410 $300 Implemented
CO0316 # 06 Y:1994 06 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,900 $7,530 Implemented
CO0316 # 07 Y:1994 07 1994 USE SQUEEGEES, MOPS, AND VACUUMS FOR FLOOR CLEANING $3,260 $700 Implemented
CO0316 # 08 Y:1994 08 1994 INSULATE BARE EQUIPMENT $2,710 $1,850 Implemented
ND0192 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,500 $3,780 Implemented
ND0192 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,208 $280 Implemented
ND0192 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,129 $293 Implemented
WI0212 # 01 Y:1994 01 1994 INSULATE BARE EQUIPMENT $5,416 $492 Implemented
WI0212 # 06 Y:1994 06 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $585 $370 Implemented
WI0212 # 10 Y:1994 10 1994 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,000 $7,000 Implemented
WI0207 # 01 Y:1994 01 1994 RECOVER WASTE HEAT FROM EQUIPMENT $10,556 $6,000 Implemented
WI0207 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,382 $8,346 Implemented
WI0207 # 08 Y:1994 08 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $708 $820 Implemented
HO0071 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,097 $8,138 Implemented