IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75

matching recommendations
Reset
SIC 345 Screw Machine Products, Bolts, Etc.
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0088 # 07 Y:1993 07 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,290 $650 Implemented
AS0088 # 08 Y:1993 08 1993 USE SYNTHETIC LUBRICANT $2,626 $4,776 Implemented
AS0088 # 09 Y:1993 09 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $628 $1,380 Implemented
AS0088 # 10 Y:1993 10 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,254 $0 Implemented
AS0088 # 11 Y:1993 11 1993 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $704 $2,450 Not Implemented
AS0088 # 12 Y:1993 12 1993 INSTALL TIMERS AND/OR THERMOSTATS $1,022 $1,120 Implemented
AS0064 # 03 Y:1992 03 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,671 $0 Not Implemented
AS0064 # 04 Y:1992 04 1992 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,658 $64,750 Not Implemented
AS0064 # 05 Y:1992 05 1992 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $9,990 $7,000 Not Implemented
AS0064 # 06 Y:1992 06 1992 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $1,369 $3,500 Not Implemented
AS0064 # 07 Y:1992 07 1992 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,801 $0 Not Implemented
AS0064 # 08 Y:1992 08 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $250 $50 Not Implemented
AS0064 # 09 Y:1992 09 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,455 $500 Not Implemented
AS0064 # 02 Y:1992 02 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $746 $5,150 Not Implemented
AS0064 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,164 $10,246 Not Implemented
AS0039 # 10 Y:1991 10 1991 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $315 $100 Not Implemented
AS0039 # 09 Y:1991 09 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $397 $30 Not Implemented
AS0039 # 08 Y:1991 08 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $496 $3,190 Not Implemented
AS0039 # 07 Y:1991 07 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $187 $0 Not Implemented
AS0039 # 06 Y:1991 06 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $261 $663 Not Implemented
AS0039 # 05 Y:1991 05 1991 IMPROVE LUBRICATION PRACTICES $392 $0 Not Implemented
AS0039 # 04 Y:1991 04 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,175 $300 Not Implemented
AS0039 # 03 Y:1991 03 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $240 $200 Not Implemented
AS0039 # 02 Y:1991 02 1991 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,531 $1,000 Not Implemented
AS0039 # 01 Y:1991 01 1991 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,490 $35,000 Not Implemented