IAC Assessment: AS0088
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0088
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1993
Principal Product CABLE CONNECTORS (TV)
NAICS n/a
SIC 3451 - Screw Machine Products
Sales $5,000,000-$10,000,000
# of Employees 85
Plant Area (Sq.Ft.) 0
Annual Production 14,000,000 Pieces
Production Hrs. Annual 5,303
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $61,806 863,130 kWh $0.07
TOTAL ENERGY COSTS $61,806
RECOMMENDED SAVINGS* $11,984 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,998
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$775
Cost:
$1,485
$897 12,603 $(-122) - $897
12,603
kWh
$(-122)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$243
Cost:
$420
$268 3,810 $(-25) - $268
3,810
kWh
$(-25)
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$900
Cost:
$1,166
$900 12,603 - - $900
12,603
kWh
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$191
Cost:
$375
$191 2,638 - - $191
2,638
kWh
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$160
Cost:
$136
$195 2,638 $(-35) - $195
2,638
kWh
$(-35)
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$191
Cost:
$260
$191 2,638 - - $191
2,638
kWh
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,290
Cost:
$650
$3,290 46,014 - - $3,290
46,014
kWh
-
-
$
08: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$2,626
Cost:
$4,776
$848 11,723 $1,778 - $848
11,723
kWh
$1,778
-
$
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$628
Cost:
$1,380
$628 8,792 - - $628
8,792
kWh
-
-
$
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,254
Cost:
-
$1,254 17,585 - - $1,254
17,585
kWh
-
-
$
11: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$704
Cost:
$2,450
$704 9,965 - - $704
9,965
kWh
-
-
$
12: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,022
Cost:
$1,120
$1,022 14,361 - - $1,022
14,361
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$11,984
Cost:
$14,218
$10,388 145,370 $1,596 - $10,388
145,370
kWh
$1,596
-
$
TOTAL IMPLEMENTED Savings:
$9,998
Cost:
$9,967
$8,402 117,526 $1,596 - $8,402
117,526
kWh
$1,596
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes