IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 3452 Bolts, Nuts, Rivets, And Washers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0139 # 12 Y:1999 12 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $528 $250 Not Implemented
BD0139 # 11 Y:1999 11 1999 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $55,272 $5,000 Not Implemented
BD0139 # 10 Y:1999 10 1999 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $3,154 $9,500 Implemented
BD0139 # 09 Y:1999 09 1999 REPROCESS SPENT OILS ON SITE FOR RE-USE $7,003 $5,500 Not Implemented
BD0139 # 08 Y:1999 08 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $275 $410 Implemented
BD0139 # 07 Y:1999 07 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $630 $545 Implemented
BD0139 # 06 Y:1999 06 1999 INSTALL OCCUPANCY SENSORS $1,586 $750 Not Implemented
BD0139 # 05 Y:1999 05 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,135 $1,200 Not Implemented
BD0139 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,316 $0 Implemented
BD0139 # 03 Y:1999 03 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,947 $4,800 Not Implemented
BD0139 # 02 Y:1999 02 1999 USE SYNTHETIC LUBRICANT $7,711 $2,400 Implemented
BD0139 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,947 $28,000 Implemented
AM0353 # 14 Y:1999 14 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $240 $250 Implemented
AM0353 # 01 Y:1999 01 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $36,600 $16,200 Not Implemented
AM0353 # 13 Y:1999 13 1999 INSTALL SKYLIGHTS $300 $1,400 Implemented
AM0353 # 12 Y:1999 12 1999 CHECK FOR ACCURACY OF UTILITY / POWER METERS $557 $0 Implemented
AM0353 # 11 Y:1999 11 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $600 $0 Implemented
AM0353 # 10 Y:1999 10 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $920 $0 Implemented
AM0353 # 09 Y:1999 09 1999 INSULATE BARE EQUIPMENT $1,030 $81 Implemented
AM0353 # 08 Y:1999 08 1999 INSTALL SKYLIGHTS $1,430 $4,130 Not Implemented
AM0353 # 07 Y:1999 07 1999 PAY BILLS ON TIME TO AVOID LATE FEES $1,649 $0 Implemented
AM0353 # 06 Y:1999 06 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,360 $0 Implemented
AM0353 # 05 Y:1999 05 1999 MAINTAIN MACHINES TO REDUCE LEAKS $2,700 $500 Implemented
AM0353 # 04 Y:1999 04 1999 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $8,100 $8,500 Implemented
AM0353 # 03 Y:1999 03 1999 REDUCE SCRAP PRODUCTION $30,900 $0 Implemented