Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsSIC | 3452 | Bolts, Nuts, Rivets, And Washers |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0139 # 12 Y:1999 | 12 | 1999 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $528 | $250 | Not Implemented |
BD0139 # 11 Y:1999 | 11 | 1999 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $55,272 | $5,000 | Not Implemented |
BD0139 # 10 Y:1999 | 10 | 1999 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $3,154 | $9,500 | Implemented |
BD0139 # 09 Y:1999 | 09 | 1999 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $7,003 | $5,500 | Not Implemented |
BD0139 # 08 Y:1999 | 08 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $275 | $410 | Implemented |
BD0139 # 07 Y:1999 | 07 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $630 | $545 | Implemented |
BD0139 # 06 Y:1999 | 06 | 1999 | INSTALL OCCUPANCY SENSORS | $1,586 | $750 | Not Implemented |
BD0139 # 05 Y:1999 | 05 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,135 | $1,200 | Not Implemented |
BD0139 # 04 Y:1999 | 04 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,316 | $0 | Implemented |
BD0139 # 03 Y:1999 | 03 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,947 | $4,800 | Not Implemented |
BD0139 # 02 Y:1999 | 02 | 1999 | USE SYNTHETIC LUBRICANT | $7,711 | $2,400 | Implemented |
BD0139 # 01 Y:1999 | 01 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $15,947 | $28,000 | Implemented |
AM0353 # 14 Y:1999 | 14 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $240 | $250 | Implemented |
AM0353 # 01 Y:1999 | 01 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $36,600 | $16,200 | Not Implemented |
AM0353 # 13 Y:1999 | 13 | 1999 | INSTALL SKYLIGHTS | $300 | $1,400 | Implemented |
AM0353 # 12 Y:1999 | 12 | 1999 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $557 | $0 | Implemented |
AM0353 # 11 Y:1999 | 11 | 1999 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $600 | $0 | Implemented |
AM0353 # 10 Y:1999 | 10 | 1999 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $920 | $0 | Implemented |
AM0353 # 09 Y:1999 | 09 | 1999 | INSULATE BARE EQUIPMENT | $1,030 | $81 | Implemented |
AM0353 # 08 Y:1999 | 08 | 1999 | INSTALL SKYLIGHTS | $1,430 | $4,130 | Not Implemented |
AM0353 # 07 Y:1999 | 07 | 1999 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,649 | $0 | Implemented |
AM0353 # 06 Y:1999 | 06 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,360 | $0 | Implemented |
AM0353 # 05 Y:1999 | 05 | 1999 | MAINTAIN MACHINES TO REDUCE LEAKS | $2,700 | $500 | Implemented |
AM0353 # 04 Y:1999 | 04 | 1999 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $8,100 | $8,500 | Implemented |
AM0353 # 03 Y:1999 | 03 | 1999 | REDUCE SCRAP PRODUCTION | $30,900 | $0 | Implemented |