IAC Assessment: BD0139
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0139
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 1999
Principal Product Metal Fasteners
NAICS n/a
SIC 3452 - Bolts, Nuts, Rivets, And Washers
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 143,000
Annual Production 13,700,000 Pounds
Production Hrs. Annual 6,032
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $521,027 7,371,923 kWh $0.07
Electricity Demand $226,327 16,022 kW-months/year $14.13
Electricity Fees $1,934 - $ -
Natural Gas $35,348 11,526 MMBtu $3.07
TOTAL ENERGY COSTS $821,794
RECOMMENDED SAVINGS* $103,504 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,033
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) By-product Production Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) By-product Production
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$15,947
Cost:
$28,000
$10,395 261,723 $5,552 393 - - - - - - - - $10,395
261,723
kWh
$5,552
393
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
02: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$7,711
Cost:
$2,400
$4,515 113,716 $3,196 226 - - - - - - - - $4,515
113,716
kWh
$3,196
226
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,947
Cost:
$4,800
$3,877 97,597 $2,070 147 - - - - - - - - $3,877
97,597
kWh
$2,070
147
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,316
Cost:
-
$1,941 48,945 $1,375 97 - - - - - - - - $1,941
48,945
kWh
$1,375
97
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,135
Cost:
$1,200
$2,013 50,996 $793 60 $(-671) (-218) - - - - - - $2,013
50,996
kWh
$793
60
kW-months/year
$(-671)
(-218)
MMBtu
-
-
Tgal
-
-
lb
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,586
Cost:
$750
$882 22,274 $704 50 - - - - - - - - $882
22,274
kWh
$704
50
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$630
Cost:
$545
$286 7,327 $344 24 - - - - - - - - $286
7,327
kWh
$344
24
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$275
Cost:
$410
$185 4,689 $90 6 - - - - - - - - $185
4,689
kWh
$90
6
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
09: 3.5112 REPROCESS SPENT OILS ON SITE FOR RE-USE Savings:
$7,003
Cost:
$5,500
- - - - - - - - $7,003 19,305 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$7,003
19,305
lb
-
-
$
10: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$3,154
Cost:
$9,500
$(-397) (-9,965) $(-346) (-25) - - $3,897 682,500 - - - - $(-397)
(-9,965)
kWh
$(-346)
(-25)
kW-months/year
-
-
MMBtu
$3,897
682,500
Tgal
-
-
lb
-
-
$
11: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$55,272
Cost:
$5,000
- - - - - - - - $55,272 40,944 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$55,272
40,944
lb
-
-
$
12: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$528
Cost:
$250
- - - - - - - - - - $528 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
$528
-
$
TOTAL RECOMMENDED Savings:
$103,504
Cost:
$58,355
$23,697 597,302 $13,778 978 $(-671) (-218) $3,897 682,500 $62,275 60,249 $528 - $23,697
597,302
kWh
$13,778
978
kW-months/year
$(-671)
(-218)
MMBtu
$3,897
682,500
Tgal
$62,275
60,249
lb
$528
-
$
TOTAL IMPLEMENTED Savings:
$31,033
Cost:
$40,855
$16,925 426,435 $10,211 721 - - $3,897 682,500 - - - - $16,925
426,435
kWh
$10,211
721
kW-months/year
-
-
MMBtu
$3,897
682,500
Tgal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) By-product Production Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) By-product Production