IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,574

matching recommendations
Reset
SIC 346 Metal Forgings And Stampings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0503 # 02 Y:2021 02 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,108 $45,000 Implemented
LE0503 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,254 $17,500 Implemented
LE0503 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,126 $15,100 Implemented
LE0503 # 05 Y:2021 05 2021 PREHEAT COMBUSTION AIR WITH WASTE HEAT $56,981 $300,000 Implemented
WV0605 # 01 Y:2021 01 2021 UPGRADE CONTROLS ON COMPRESSORS $59,363 $10,625 Not Implemented
WV0605 # 02 Y:2021 02 2021 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $37,902 $115,920 Not Implemented
WV0605 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN WATER LINES AND VALVES $29,737 $10,000 Not Implemented
WV0605 # 04 Y:2021 04 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $20,502 $2,155 Not Implemented
WV0605 # 05 Y:2021 05 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,719 $125 Implemented
WV0605 # 06 Y:2021 06 2021 DEVELOP A REPAIR/REPLACE POLICY $14,806 $683 Implemented
WV0605 # 07 Y:2021 07 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,015 $4,100 Implemented
WV0605 # 08 Y:2021 08 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,600 $1,326 Implemented
WV0605 # 09 Y:2021 09 2021 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $10,833 $1,500 Implemented
WV0605 # 10 Y:2021 10 2021 INSTALL OCCUPANCY SENSORS $8,864 $20,709 Not Implemented
WV0605 # 11 Y:2021 11 2021 INSULATE BARE EQUIPMENT $6,929 $10,915 Not Implemented
WV0605 # 12 Y:2021 12 2021 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,500 $30,000 Not Implemented
IP0137 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $2,249 $0 Implemented
IP0137 # 02 Y:2020 02 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $609 $0 Implemented
IP0137 # 03 Y:2020 03 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $64,260 $1,554 Not Implemented
IP0137 # 04 Y:2020 04 2020 RECOVER WASTE HEAT FROM EQUIPMENT $6,117 $2,100 Implemented
IP0137 # 05 Y:2020 05 2020 USE PHOTOCELL CONTROLS $184 $138 Not Implemented
IP0137 # 06 Y:2020 06 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $789 $1,348 Implemented
IP0137 # 07 Y:2020 07 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,777 $4,138 Implemented
IP0137 # 08 Y:2020 08 2020 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $14,497 $39,760 Not Implemented
UA0222 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,232 $92,405 Implemented