IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

967

matching recommendations
Reset
SIC 3469 Metal Stampings, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0201 # 03 Y:2024 03 2024 INSTALL SUB-METERING EQUIPMENT $3,904 $700 n/a
IP0201 # 05 Y:2024 05 2024 RECOVER WASTE HEAT FROM EQUIPMENT $4,991 $1,471 n/a
IP0201 # 04 Y:2024 04 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $133,638 $39,257 n/a
IP0201 # 02 Y:2024 02 2024 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $9,654 $0 n/a
IP0201 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $55,084 $0 n/a
IP0201 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $2,678 $1,198 n/a
IP0201 # 07 Y:2024 07 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,237 $2,101 n/a
IP0201 # 08 Y:2024 08 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,830 $25,000 n/a
NT0024 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,083 $5,482 n/a
NT0024 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,921 $5,609 n/a
NT0024 # 04 Y:2024 04 2024 APPLY FOR INVESTMENT INCENTIVES $5,847 $0 n/a
NT0024 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $4,810 $1,986 n/a
NT0024 # 06 Y:2024 06 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $351 $180 n/a
NT0024 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,929 $5,415 n/a
NT0002 # 06 Y:2023 06 2023 AUTOMATE FINISHING PROCESS $96,307 $111,000 Not Implemented
NT0002 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,026 $2,499 Implemented
NT0002 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,414 $5,801 Implemented
NT0002 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $14,389 $21,853 Not Implemented
NT0002 # 05 Y:2023 05 2023 ELIMINATE/REDUCE AN OPERATION $9,631 $0 Implemented
NT0002 # 04 Y:2023 04 2023 INSTALL SET-BACK TIMERS $1,504 $0 Implemented
NT0002 # 07 Y:2023 07 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,880 $7,474 Implemented
UD1049 # 03 Y:2023 03 2023 REDUCE VENTILATION AIR $153,776 $45,000 Not Implemented
UD1049 # 02 Y:2023 02 2023 CHECK FOR ACCURACY OF UTILITY / POWER METERS $9,224 $0 Not Implemented
UD1049 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $10,825 $0 Implemented
UD1049 # 04 Y:2023 04 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $72,916 $709 Not Implemented