Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
959
matching recommendationsSIC | 3469 | Metal Stampings, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NT0024 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,083 | $5,482 | n/a |
NT0024 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,929 | $5,415 | n/a |
NT0024 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,921 | $5,609 | n/a |
NT0024 # 06 Y:2024 | 06 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $351 | $180 | n/a |
NT0024 # 04 Y:2024 | 04 | 2024 | APPLY FOR INVESTMENT INCENTIVES | $5,847 | $0 | n/a |
NT0024 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $4,810 | $1,986 | n/a |
NT0002 # 05 Y:2023 | 05 | 2023 | ELIMINATE/REDUCE AN OPERATION | $9,631 | $0 | Implemented |
NT0002 # 02 Y:2023 | 02 | 2023 | OPTIMIZE PLANT POWER FACTOR | $14,389 | $21,853 | Not Implemented |
NT0002 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,026 | $2,499 | Implemented |
NT0002 # 07 Y:2023 | 07 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,880 | $7,474 | Implemented |
NT0002 # 04 Y:2023 | 04 | 2023 | INSTALL SET-BACK TIMERS | $1,504 | $0 | Implemented |
NT0002 # 06 Y:2023 | 06 | 2023 | AUTOMATE FINISHING PROCESS | $96,307 | $111,000 | Not Implemented |
NT0002 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,414 | $5,801 | Implemented |
UD1049 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,825 | $0 | Implemented |
UD1049 # 11 Y:2023 | 11 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $37,994 | $22,360 | Not Implemented |
UD1049 # 06 Y:2023 | 06 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,943 | $20,000 | Not Implemented |
UD1049 # 10 Y:2023 | 10 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,436 | $50 | Not Implemented |
UD1049 # 03 Y:2023 | 03 | 2023 | REDUCE VENTILATION AIR | $153,776 | $45,000 | Not Implemented |
UD1049 # 04 Y:2023 | 04 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $72,916 | $709 | Not Implemented |
UD1049 # 02 Y:2023 | 02 | 2023 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $9,224 | $0 | Not Implemented |
UD1049 # 09 Y:2023 | 09 | 2023 | INSTALL OCCUPANCY SENSORS | $38,668 | $14,325 | Not Implemented |
UD1049 # 07 Y:2023 | 07 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $27,897 | $0 | Implemented |
UD1049 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $115,254 | $300,000 | Implemented |
UD1049 # 05 Y:2023 | 05 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,075 | $952 | Not Implemented |
WV0617 # 10 Y:2021 | 10 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $450 | $638 | Implemented |