Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
967
matching recommendationsSIC | 3469 | Metal Stampings, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0201 # 03 Y:2024 | 03 | 2024 | INSTALL SUB-METERING EQUIPMENT | $3,904 | $700 | n/a |
IP0201 # 05 Y:2024 | 05 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,991 | $1,471 | n/a |
IP0201 # 04 Y:2024 | 04 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $133,638 | $39,257 | n/a |
IP0201 # 02 Y:2024 | 02 | 2024 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $9,654 | $0 | n/a |
IP0201 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $55,084 | $0 | n/a |
IP0201 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $2,678 | $1,198 | n/a |
IP0201 # 07 Y:2024 | 07 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,237 | $2,101 | n/a |
IP0201 # 08 Y:2024 | 08 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,830 | $25,000 | n/a |
NT0024 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,083 | $5,482 | n/a |
NT0024 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,921 | $5,609 | n/a |
NT0024 # 04 Y:2024 | 04 | 2024 | APPLY FOR INVESTMENT INCENTIVES | $5,847 | $0 | n/a |
NT0024 # 03 Y:2024 | 03 | 2024 | OPTIMIZE PLANT POWER FACTOR | $4,810 | $1,986 | n/a |
NT0024 # 06 Y:2024 | 06 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $351 | $180 | n/a |
NT0024 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,929 | $5,415 | n/a |
NT0002 # 06 Y:2023 | 06 | 2023 | AUTOMATE FINISHING PROCESS | $96,307 | $111,000 | Not Implemented |
NT0002 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,026 | $2,499 | Implemented |
NT0002 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,414 | $5,801 | Implemented |
NT0002 # 02 Y:2023 | 02 | 2023 | OPTIMIZE PLANT POWER FACTOR | $14,389 | $21,853 | Not Implemented |
NT0002 # 05 Y:2023 | 05 | 2023 | ELIMINATE/REDUCE AN OPERATION | $9,631 | $0 | Implemented |
NT0002 # 04 Y:2023 | 04 | 2023 | INSTALL SET-BACK TIMERS | $1,504 | $0 | Implemented |
NT0002 # 07 Y:2023 | 07 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,880 | $7,474 | Implemented |
UD1049 # 03 Y:2023 | 03 | 2023 | REDUCE VENTILATION AIR | $153,776 | $45,000 | Not Implemented |
UD1049 # 02 Y:2023 | 02 | 2023 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $9,224 | $0 | Not Implemented |
UD1049 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,825 | $0 | Implemented |
UD1049 # 04 Y:2023 | 04 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $72,916 | $709 | Not Implemented |