Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,577
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0548 # 01 Y:2004 | 01 | 2004 | REDUCE VENTILATION AIR | $13,881 | $4,244 | Not Implemented |
MA0548 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,950 | $4,150 | Not Implemented |
MA0548 # 03 Y:2004 | 03 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,609 | $19,680 | n/a |
MA0548 # 04 Y:2004 | 04 | 2004 | INSULATE BARE EQUIPMENT | $4,665 | $1,100 | Implemented |
MA0548 # 05 Y:2004 | 05 | 2004 | INSTALL TIMERS AND/OR THERMOSTATS | $1,528 | $1,625 | Not Implemented |
MA0548 # 06 Y:2004 | 06 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $699 | $3,574 | Not Implemented |
MA0548 # 07 Y:2004 | 07 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $653 | $200 | Not Implemented |
MA0548 # 08 Y:2004 | 08 | 2004 | REDUCE VENTILATION AIR | $607 | $1,831 | Not Implemented |
MA0548 # 09 Y:2004 | 09 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $414 | $200 | Not Implemented |
AS0368 # 01 Y:2004 | 01 | 2004 | INSTALL EFFICIENT RECTIFIERS | $79,520 | $51,660 | Not Implemented |
AS0368 # 02 Y:2004 | 02 | 2004 | RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION | $66,870 | $4,565 | Not Implemented |
AS0368 # 03 Y:2004 | 03 | 2004 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,943 | $52,000 | Not Implemented |
AS0368 # 04 Y:2004 | 04 | 2004 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $4,650 | $2,800 | Not Implemented |
AS0368 # 05 Y:2004 | 05 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,789 | $5,720 | Not Implemented |
AS0368 # 06 Y:2004 | 06 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,743 | $15 | Not Implemented |
AS0368 # 07 Y:2004 | 07 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,286 | $7,980 | Not Implemented |
AS0368 # 08 Y:2004 | 08 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $192 | $199 | Not Implemented |
LE0177 # 01 Y:2004 | 01 | 2004 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,980 | $1,700 | Not Implemented |
LE0177 # 02 Y:2004 | 02 | 2004 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $2,947 | $5,000 | Not Implemented |
LE0177 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,194 | $0 | Implemented |
LE0177 # 04 Y:2004 | 04 | 2004 | USE OPTIMUM THICKNESS INSULATION | $516 | $585 | Implemented |
GT0774 # 01 Y:2003 | 01 | 2003 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $8,200 | $0 | Implemented |
GT0774 # 02 Y:2003 | 02 | 2003 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,135 | $2,700 | Not Implemented |
GT0774 # 03 Y:2003 | 03 | 2003 | INCREASE AMOUNT OF CONDENSATE RETURNED | $7,977 | $2,500 | Implemented |
GT0774 # 04 Y:2003 | 04 | 2003 | INSULATE BARE EQUIPMENT | $164 | $300 | Not Implemented |