Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,577
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0009 # 08 Y:1994 | 08 | 1994 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $9,325 | $6,000 | Not Implemented |
UM0009 # 09 Y:1994 | 09 | 1994 | INSTALL / REPAIR INSULATION ON STEAM LINES | $930 | $196 | Implemented |
UM0009 # 10 Y:1994 | 10 | 1994 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,829 | $1,500 | Implemented |
UM0009 # 11 Y:1994 | 11 | 1994 | USE RADIANT HEATER FOR SPOT HEATING | $8,161 | $21,400 | Implemented |
OR0209 # 01 Y:1994 | 01 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $732 | $750 | Not Implemented |
OR0209 # 02 Y:1994 | 02 | 1994 | IMPROVE COMBUSTION CONTROL CAPABILITY | $27,860 | $12,000 | Implemented |
OR0209 # 03 Y:1994 | 03 | 1994 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $274 | $0 | Implemented |
OR0209 # 04 Y:1994 | 04 | 1994 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,640 | $2,670 | Implemented |
OR0209 # 05 Y:1994 | 05 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $185 | $248 | Implemented |
OR0209 # 06 Y:1994 | 06 | 1994 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $67,700 | $260,000 | Implemented |
UM0003 # 01 Y:1994 | 01 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $28,560 | $49,340 | Implemented |
UM0003 # 02 Y:1994 | 02 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,804 | $0 | Not Implemented |
UM0003 # 03 Y:1994 | 03 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $470 | $400 | Implemented |
UM0003 # 04 Y:1994 | 04 | 1994 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,462 | $2,000 | Not Implemented |
UM0003 # 05 Y:1994 | 05 | 1994 | USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC | $52,311 | $39,200 | Not Implemented |
WI0204 # 01 Y:1994 | 01 | 1994 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $19,288 | $10,000 | Not Implemented |
WI0204 # 02 Y:1994 | 02 | 1994 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $16,124 | $500 | Implemented |
WI0204 # 03 Y:1994 | 03 | 1994 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,431 | $1,400 | Not Implemented |
WI0204 # 04 Y:1994 | 04 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $491 | $1,920 | Not Implemented |
WI0204 # 05 Y:1994 | 05 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $488 | $0 | Implemented |
WI0204 # 06 Y:1994 | 06 | 1994 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $18,227 | $66,000 | Implemented |
WI0204 # 07 Y:1994 | 07 | 1994 | ELIMINATE/REDUCE AN OPERATION | $3,499 | $6,000 | Not Implemented |
SF0019 # 01 Y:1994 | 01 | 1994 | USE POWER DURING OFF-PEAK PERIODS | $6,225 | $4,000 | Implemented |
SF0019 # 02 Y:1994 | 02 | 1994 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,939 | $800 | Implemented |
SF0019 # 03 Y:1994 | 03 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,685 | $400 | Implemented |