IAC logo
IAC Assessment: ND0219
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ND0219
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Notre Dame Univ.
Assessment Year 1995
Principal Product Industrial Coatings
NAICS n/a
SIC 3479 - Metal Coating And Allied Services
Sales $5,000,000-$10,000,000
# of Employees 115
Plant Area (Sq.Ft.) 40,000
Annual Production 700 Pieces
Production Hrs. Annual 7,200
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $121,857 2,348,769 kWh $0.05
Natural Gas $93,190 20,107 MMBtu $4.63
TOTAL ENERGY COSTS $978,907
RECOMMENDED SAVINGS* $76,384 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $76,384
#|Description Savings
Cost
Status Electricity Usage Water Disposal Other Liquid (non-haz) Electricity Usage Water Disposal Other Liquid (non-haz)
$ kWh $ Tgal $ gal
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,069
Cost:
$600
$8,069 155,627 - - - - $8,069
155,627
kWh
-
-
Tgal
-
-
gal
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,373
Cost:
$200
$3,373 65,064 - - - - $3,373
65,064
kWh
-
-
Tgal
-
-
gal
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,443
Cost:
$2,720
$2,443 47,186 - - - - $2,443
47,186
kWh
-
-
Tgal
-
-
gal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,277
Cost:
$1,180
$2,277 43,962 - - - - $2,277
43,962
kWh
-
-
Tgal
-
-
gal
05: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$42,622
Cost:
$50,000
$1,250 24,033 $41,372 109,500 - - $1,250
24,033
kWh
$41,372
109,500
Tgal
-
-
gal
06: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING Savings:
$17,600
Cost:
$24,500
- - - - $17,600 275 -
-
kWh
-
-
Tgal
$17,600
275
gal
TOTAL RECOMMENDED Savings:
$76,384
Cost:
$79,200
$17,412 335,872 $41,372 109,500 $17,600 275 $17,412
335,872
kWh
$41,372
109,500
Tgal
$17,600
275
gal
TOTAL IMPLEMENTED Savings:
$76,384
Cost:
$79,200
$17,412 335,872 $41,372 109,500 $17,600 275 $17,412
335,872
kWh
$41,372
109,500
Tgal
$17,600
275
gal
Savings
Cost
$ kWh $ Tgal $ gal
Electricity Usage Water Disposal Other Liquid (non-haz) Electricity Usage Water Disposal Other Liquid (non-haz)