Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
265
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SJ0023 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,625 | $0 | n/a |
SJ0023 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,823 | $2,466 | n/a |
SJ0023 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $848 | $2,144 | n/a |
SJ0023 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $21,134 | $146,494 | n/a |
SJ0023 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $1,478 | $305 | n/a |
SJ0023 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,164 | $1,874 | n/a |
SJ0023 # 07 Y:2024 | 07 | 2024 | INSULATE BARE EQUIPMENT | $190 | $380 | n/a |
SD0657 # 06 Y:2024 | 06 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,186 | $10,841 | n/a |
SD0657 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,484 | $6,349 | n/a |
SD0657 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,534 | $5,677 | n/a |
SD0657 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $65,886 | $151,862 | n/a |
SD0657 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,234 | $2,880 | n/a |
SD0657 # 04 Y:2024 | 04 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $18,206 | $0 | n/a |
SD0657 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,983 | $13,634 | n/a |
SD0657 # 08 Y:2024 | 08 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,440 | $3,627 | n/a |
SF0617 # 04 Y:2024 | 04 | 2024 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $614,286 | $1,532,000 | n/a |
SF0617 # 05 Y:2024 | 05 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $44,171 | $125,600 | n/a |
SF0617 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,186 | $0 | n/a |
SF0617 # 03 Y:2024 | 03 | 2024 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $99,094 | $49,118 | n/a |
SF0617 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $552,254 | $2,633,668 | n/a |
SF0617 # 02 Y:2024 | 02 | 2024 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $6,885 | $3,504 | n/a |
SD0651 # 09 Y:2024 | 09 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,214 | $5,037 | n/a |
SD0651 # 08 Y:2024 | 08 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $41,268 | $1,200 | n/a |
SD0651 # 10 Y:2024 | 10 | 2024 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $30,573 | $17,505 | n/a |
SD0651 # 11 Y:2024 | 11 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,767 | $1,590 | n/a |