IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
Reset
SIC 347 Metal Services, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL2101 # 05 Y:2021 05 2021 INSTALL TIMERS AND/OR THERMOSTATS $1,761 $186 n/a
CL2101 # 04 Y:2021 04 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,276 $500 n/a
CL2101 # 03 Y:2021 03 2021 INSTALL TIMERS AND/OR THERMOSTATS $848 $800 n/a
CL2101 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $9,334 $3,875 n/a
CL2101 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,572 $6,373 n/a
CL2008 # 03 Y:2020 03 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,758 $2,616 Implemented
CL2008 # 02 Y:2020 02 2020 PREHEAT COMBUSTION AIR WITH WASTE HEAT $908 $4,500 Not Implemented
CL2008 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,868 $0 Implemented
CL1803 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $386 $0 Implemented
CL1803 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,656 $2,080 Implemented
CL1803 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,516 $9,852 Implemented
CL1803 # 01 Y:2018 01 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $40,277 $14,300 Implemented
CL1704 # 01 Y:2017 01 2017 RECOVER AND REUSE COOLING WATER $31,006 $0 Not Implemented
CL1704 # 05 Y:2017 05 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,502 $900 Not Implemented
CL1704 # 04 Y:2017 04 2017 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $3,656 $3,050 Not Implemented
CL1704 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,811 $21,000 Implemented
CL1704 # 02 Y:2017 02 2017 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $11,470 $15,000 Implemented