Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
17
matching recommendationsSIC | 347 | Metal Services, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CL2101 # 05 Y:2021 | 05 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $1,761 | $186 | n/a |
CL2101 # 04 Y:2021 | 04 | 2021 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $1,276 | $500 | n/a |
CL2101 # 03 Y:2021 | 03 | 2021 | INSTALL TIMERS AND/OR THERMOSTATS | $848 | $800 | n/a |
CL2101 # 02 Y:2021 | 02 | 2021 | INSTALL OCCUPANCY SENSORS | $9,334 | $3,875 | n/a |
CL2101 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,572 | $6,373 | n/a |
CL2008 # 03 Y:2020 | 03 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,758 | $2,616 | Implemented |
CL2008 # 02 Y:2020 | 02 | 2020 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $908 | $4,500 | Not Implemented |
CL2008 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,868 | $0 | Implemented |
CL1803 # 04 Y:2018 | 04 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $386 | $0 | Implemented |
CL1803 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,656 | $2,080 | Implemented |
CL1803 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,516 | $9,852 | Implemented |
CL1803 # 01 Y:2018 | 01 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $40,277 | $14,300 | Implemented |
CL1704 # 01 Y:2017 | 01 | 2017 | RECOVER AND REUSE COOLING WATER | $31,006 | $0 | Not Implemented |
CL1704 # 05 Y:2017 | 05 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,502 | $900 | Not Implemented |
CL1704 # 04 Y:2017 | 04 | 2017 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $3,656 | $3,050 | Not Implemented |
CL1704 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,811 | $21,000 | Implemented |
CL1704 # 02 Y:2017 | 02 | 2017 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $11,470 | $15,000 | Implemented |