IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

364

matching recommendations
Reset
SIC 348 Ordnance And Accessories, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CI0015 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,444 $2,700 n/a
CI0015 # 07 Y:2023 07 2023 RECOVER WASTE HEAT FROM EQUIPMENT $1,292 $5,000 n/a
CI0015 # 08 Y:2023 08 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,262 $1,310 n/a
CI0015 # 02 Y:2023 02 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $36,511 $165,000 n/a
CI0015 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,757 $0 n/a
CI0015 # 04 Y:2023 04 2023 REPLACE BOILER $3,770 $9,000 n/a
CI0015 # 05 Y:2023 05 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $1,958 $3,500 n/a
CI0015 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $88,567 $1,500 n/a
OK1063 # 02 Y:2022 02 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,446 $0 Not Implemented
OK1063 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,908 $6,335 Not Implemented
OK1063 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,892 $617 Not Implemented
OK1063 # 03 Y:2022 03 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,123 $2,600 Not Implemented
UU0184 # 03 Y:2021 03 2021 OPTIMIZE PLANT POWER FACTOR $2,375 $6,744 Not Implemented
UU0184 # 01 Y:2021 01 2021 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $26,453 $92,586 Implemented
UU0184 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,459 $2,700 Not Implemented
UU0184 # 04 Y:2021 04 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $1,530 $500 Not Implemented
UU0184 # 05 Y:2021 05 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $731 $2,000 Not Implemented
UU0184 # 06 Y:2021 06 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $546 $550 Not Implemented
OK0980 # 02 Y:2018 02 2018 USE PHOTOCELL CONTROLS $1,443 $4,790 Not Implemented
OK0980 # 04 Y:2018 04 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23,198 $23,580 Not Implemented
OK0980 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,611 $7,298 Not Implemented
OK0980 # 05 Y:2018 05 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $24,343 $31,350 Not Implemented
OK0980 # 06 Y:2018 06 2018 OPTIMIZE PLANT POWER FACTOR $13,258 $16,892 Not Implemented
OK0980 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $12,254 $1,350 Implemented
OK0984 # 02 Y:2018 02 2018 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $22,864 $1,500 Not Implemented