Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of California, Irvine |
---|---|
Assessment Year | 2023 |
Principal Product | Combustible Ordnance |
NAICS | 339999 - All Other Miscellaneous Manufacturing |
SIC | 3489 - Ordnance And Accessories, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 219 |
Plant Area (Sq.Ft.) | 89,743 |
Annual Production | 3,000,000 Pieces |
Production Hrs. Annual | 1,960 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,217,040 | 8,743,200 | kWh | $0.14 |
Electricity Demand | $165,726 | 24,552 | kW-months/year | $6.75 |
Natural Gas | $194,621 | 48,505 | MMBtu | $4.01 |
TOTAL ENERGY COSTS | $1,610,358 | |||
RECOMMENDED SAVINGS* | $146,561 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $36,511 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $88,567 Cost: $1,500 |
$87,485 | 628,495 | $1,082 | 160 | - | - |
$87,485 628,495 kWh |
$1,082 160 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $36,511 Cost: $165,000 |
$36,511 | 262,296 | - | - | - | - |
$36,511 262,296 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $11,757 Cost: - |
$11,292 | 81,120 | $465 | 69 | - | - |
$11,292 81,120 kWh |
$465 69 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1224 REPLACE BOILER |
Savings: $3,770 Cost: $9,000 |
$(-3,056) | (-21,952) | $(-182) | (-27) | $7,008 | 1,549 |
$(-3,056) (-21,952) kWh |
$(-182) (-27) kW-months/year |
$7,008 1,549 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT |
Savings: $1,958 Cost: $3,500 |
$1,958 | 14,067 | - | - | - | - |
$1,958 14,067 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,444 Cost: $2,700 |
$1,113 | 7,997 | $331 | 49 | - | - |
$1,113 7,997 kWh |
$331 49 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,292 Cost: $5,000 |
- | - | - | - | $1,292 | 286 |
- - kWh |
- - kW-months/year |
$1,292 286 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,262 Cost: $1,310 |
$1,050 | 7,543 | $212 | 31 | - | - |
$1,050 7,543 kWh |
$212 31 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $146,561 Cost: $188,010 |
$136,353 | 979,566 | $1,908 | 283 | $8,300 | 1,835 | $136,353 979,566 kWh |
$1,908 283 kW-months/year |
$8,300 1,835 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $36,511 Cost: $165,000 |
$36,511 | 262,296 | - | - | - | - | $36,511 262,296 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |