Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
64
matching recommendationsSIC | 3484 | Small Arms |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1063 # 03 Y:2022 | 03 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,123 | $2,600 | Not Implemented |
OK1063 # 04 Y:2022 | 04 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,908 | $6,335 | Not Implemented |
OK1063 # 02 Y:2022 | 02 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,446 | $0 | Not Implemented |
OK1063 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,892 | $617 | Not Implemented |
OK0984 # 01 Y:2018 | 01 | 2018 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $2,990 | $1,320 | Implemented |
OK0984 # 02 Y:2018 | 02 | 2018 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $22,864 | $1,500 | Not Implemented |
OK0984 # 05 Y:2018 | 05 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,456 | $10,800 | Implemented |
OK0984 # 03 Y:2018 | 03 | 2018 | INSTALL SET-BACK TIMERS | $1,202 | $740 | Not Implemented |
OK0984 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,118 | $6,150 | Implemented |
MA0780 # 02 Y:2017 | 02 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $583 | $100 | Not Implemented |
MA0780 # 03 Y:2017 | 03 | 2017 | USE OPTIMUM THICKNESS INSULATION | $575 | $865 | Not Implemented |
MA0780 # 01 Y:2017 | 01 | 2017 | USE SOLAR HEAT FOR HEAT | $66,074 | $629,413 | Not Implemented |
AS0441 # 02 Y:2017 | 02 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,783 | $37,000 | Implemented |
AS0441 # 01 Y:2017 | 01 | 2017 | UPGRADE CONTROLS ON COMPRESSORS | $174,581 | $25,494 | Not Implemented |
AS0441 # 03 Y:2017 | 03 | 2017 | USE SOLAR HEAT TO HEAT WATER | $1,380 | $1,005 | Not Implemented |
MA0634 # 06 Y:2008 | 06 | 2008 | INSTALL / REPAIR INSULATION ON STEAM LINES | $498 | $500 | Implemented |
MA0634 # 05 Y:2008 | 05 | 2008 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $1,034 | $6,000 | Not Implemented |
MA0634 # 01 Y:2008 | 01 | 2008 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,014 | $119,495 | Implemented |
MA0634 # 03 Y:2008 | 03 | 2008 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $2,058 | $3,000 | Not Implemented |
MA0634 # 04 Y:2008 | 04 | 2008 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,932 | $2,500 | Implemented |
MA0634 # 02 Y:2008 | 02 | 2008 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $11,407 | $20,000 | Not Implemented |
LM0039 # 07 Y:2002 | 07 | 2002 | MODIFY STARTUP/SHUTDOWN TIMES | $10,263 | $300 | Not Implemented |
LM0039 # 06 Y:2002 | 06 | 2002 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $20,000 | $600 | Implemented |
LM0039 # 03 Y:2002 | 03 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $211 | $228 | Not Implemented |
LM0039 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,338 | $550 | Not Implemented |