IAC logo
IAC Assessment: MA0634
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0634
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2008
Principal Product Rifles and shotguns
NAICS 332994 - Small Arms, Ordnance, and Ordnance Accessories Manufacturing
SIC 3484 - Small Arms
Sales $50,000,000-$100,000,000
# of Employees 268
Plant Area (Sq.Ft.) 317,000
Annual Production 151,000 Pieces
Production Hrs. Annual 4,420
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $456,042 3,974,400 kWh $0.11
Electricity Demand $42,752 10,068 kW-months/year $4.25
Electricity Fees $2,712 - $ -
Natural Gas $274,631 17,097 MMBtu $16.06
Fuel Oil #2 $65,772 3,829 MMBtu $17.18
TOTAL ENERGY COSTS $841,909
RECOMMENDED SAVINGS* $49,943 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,444
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz)
$ kWh $ kW-months/year $ MMBtu $ gal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$33,014
Cost:
$119,495
$30,154 262,900 $2,860 714 - - - - $30,154
262,900
kWh
$2,860
714
kW-months/year
-
-
MMBtu
-
-
gal
02: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$11,407
Cost:
$20,000
- - - - $11,407 709 - - -
-
kWh
-
-
kW-months/year
$11,407
709
MMBtu
-
-
gal
03: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$2,058
Cost:
$3,000
- - - - $2,058 128 - - -
-
kWh
-
-
kW-months/year
$2,058
128
MMBtu
-
-
gal
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,932
Cost:
$2,500
$262 2,300 - - - - $1,670 269,300 $262
2,300
kWh
-
-
kW-months/year
-
-
MMBtu
$1,670
269,300
gal
05: 2.7251 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF Savings:
$1,034
Cost:
$6,000
$1,034 9,105 - - - - - - $1,034
9,105
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$498
Cost:
$500
- - - - $498 31 - - -
-
kWh
-
-
kW-months/year
$498
31
MMBtu
-
-
gal
TOTAL RECOMMENDED Savings:
$49,943
Cost:
$151,495
$31,450 274,305 $2,860 714 $13,963 868 $1,670 269,300 $31,450
274,305
kWh
$2,860
714
kW-months/year
$13,963
868
MMBtu
$1,670
269,300
gal
TOTAL IMPLEMENTED Savings:
$35,444
Cost:
$122,495
$30,416 265,200 $2,860 714 $498 31 $1,670 269,300 $30,416
265,200
kWh
$2,860
714
kW-months/year
$498
31
MMBtu
$1,670
269,300
gal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal