IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

111

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0071 # 07 Y:1995 07 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,750 $11,000 Implemented
AR0071 # 06 Y:1995 06 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $712 $170 Implemented
AR0071 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,681 $0 Implemented
AR0071 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,197 $21,570 Implemented
AR0071 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,657 $650 Implemented
AR0071 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $45,351 $600 Implemented
AR0071 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,733 $6,574 Implemented
WI0251 # 08 Y:1995 08 1995 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $2,740 $6,000 Implemented
WI0251 # 06 Y:1995 06 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $719 $656 Implemented
NC0070 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,358 $360 Implemented
IA0126 # 01 Y:1995 01 1995 UPGRADE OBSOLETE EQUIPMENT $43,805 $124,000 Implemented
IA0126 # 02 Y:1995 02 1995 REDUCE VENTILATION AIR $2,054 $975 Implemented
IA0126 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $967 $2,222 Implemented
IA0126 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $1,238 $2,071 Implemented
IA0126 # 08 Y:1995 08 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,304 $341 Implemented
ND0230 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,549 $5,320 Implemented
ND0230 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,172 $792 Implemented
ND0230 # 05 Y:1995 05 1995 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $564 $650 Implemented
WI0245 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,239 $2,000 Implemented
WI0245 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $722 $1,946 Implemented
WI0245 # 10 Y:1995 10 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $119 $0 Implemented
WI0245 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $137 $100 Implemented
WI0245 # 06 Y:1995 06 1995 RECOVER WASTE HEAT FROM EQUIPMENT $351 $1,000 Implemented
WI0245 # 09 Y:1995 09 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $518 $0 Implemented
AS0157 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $944 $0 Implemented