IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,115

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0206 # 10 Y:2001 10 2001 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,210 $6,000 Not Implemented
BD0176 # 01 Y:2001 01 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,662 $12,500 Not Implemented
BD0176 # 02 Y:2001 02 2001 INSTALL OCCUPANCY SENSORS $8,517 $5,700 Not Implemented
BD0176 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,853 $1,300 Implemented
BD0176 # 04 Y:2001 04 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,269 $600 Not Implemented
BD0176 # 05 Y:2001 05 2001 USE EVAPORATION TO CONCENTRATE MATERIAL $12,394 $15,000 Not Implemented
BD0176 # 06 Y:2001 06 2001 MINIMIZE WATER USAGE $524 $575 Not Implemented
BD0176 # 07 Y:2001 07 2001 MODIFY CURRENT INCENTIVE PROGRAM $15,600 $10,000 Not Implemented
BD0176 # 08 Y:2001 08 2001 COMBINE UTILITY METERS $1,333 $1,500 Not Implemented
MS0172 # 01 Y:2000 01 2000 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,027 $1,383 Not Implemented
MS0172 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,307 $309 Implemented
MS0172 # 03 Y:2000 03 2000 INSTALL TIMERS AND/OR THERMOSTATS $624 $708 Implemented
MS0172 # 04 Y:2000 04 2000 SHUT OFF PILOTS IN STANDBY EQUIPMENT $346 $40 Implemented
MS0172 # 05 Y:2000 05 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $951 $100 Not Implemented
MS0172 # 06 Y:2000 06 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $66 $151 Not Implemented
MS0172 # 07 Y:2000 07 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $9,009 $7,649 Implemented
KU0550 # 01 Y:2000 01 2000 PREHEAT COMBUSTION AIR WITH WASTE HEAT $8,989 $17,000 Not Implemented
KU0550 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,255 $650 Not Implemented
KU0550 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,038 $20 Not Implemented
KU0550 # 04 Y:2000 04 2000 AUTOMATE FINISHING PROCESS $101,920 $34,000 Not Implemented
KU0550 # 05 Y:2000 05 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $40,768 $5,000 Not Implemented
ND0364 # 01 Y:2000 01 2000 DEVELOP A REPAIR/REPLACE POLICY $8,340 $22,377 Implemented
ND0364 # 02 Y:2000 02 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,206 $0 Implemented
ND0364 # 03 Y:2000 03 2000 INSTALL OCCUPANCY SENSORS $839 $600 Not Implemented
ND0364 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $271 $575 Implemented