IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,115

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0457 # 05 Y:2000 05 2000 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $1,880 $0 Not Implemented
CO0457 # 06 Y:2000 06 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $320 $0 Implemented
CO0457 # 07 Y:2000 07 2000 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $5,100 $1,510 Implemented
HO0220 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,042 $21,460 Not Implemented
HO0220 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $2,415 $1,000 Implemented
HO0220 # 03 Y:2000 03 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $449 $221 Implemented
HO0220 # 04 Y:2000 04 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,118 $40 Not Implemented
HO0220 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,955 $600 Implemented
HO0220 # 06 Y:2000 06 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $1,181 $120 Implemented
HO0220 # 07 Y:2000 07 2000 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $7,650 $5,000 Not Implemented
AM0363 # 01 Y:2000 01 2000 USE WATER BASED SPRAY ABRASIVES INSTEAD OF BAR ABRASIVES $13,500 $70,000 Not Implemented
AM0363 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,540 $500 Implemented
AM0363 # 03 Y:2000 03 2000 INSULATE BARE EQUIPMENT $1,245 $210 Implemented
AM0363 # 04 Y:2000 04 2000 INSTALL OCCUPANCY SENSORS $600 $180 Not Implemented
AM0363 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $470 $215 Implemented
AM0363 # 06 Y:2000 06 2000 USE SYNTHETIC LUBRICANT $180 $0 Not Implemented
WI0362 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,236 $1,860 Not Implemented
WI0362 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,550 $740 Not Implemented
WI0362 # 03 Y:2000 03 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,619 $16,000 Not Implemented
WI0362 # 04 Y:2000 04 2000 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $3,741 $14,500 Not Implemented
WI0362 # 05 Y:2000 05 2000 TREAT AND REUSE RINSE WATERS $3,598 $6,375 Implemented
WI0362 # 06 Y:2000 06 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,130 $2,150 Not Implemented
WI0362 # 07 Y:2000 07 2000 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $1,562 $0 Not Implemented
BD0150 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,594 $12,790 Implemented
BD0150 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,322 $6,908 Not Implemented