IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,255

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0126 # 03 Y:1995 03 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,064 $25 Not Implemented
IA0126 # 04 Y:1995 04 1995 RECOVER WASTE HEAT FROM EQUIPMENT $886 $320 Not Implemented
IA0126 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $967 $2,222 Implemented
IA0126 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $1,238 $2,071 Implemented
IA0126 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,106 $2,454 Not Implemented
IA0126 # 08 Y:1995 08 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,304 $341 Implemented
NC0070 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,358 $360 Implemented
NC0070 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,703 $1,348 Not Implemented
NC0070 # 03 Y:1995 03 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $634 $1,600 Not Implemented
NC0070 # 04 Y:1995 04 1995 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $5,380 $9,000 Not Implemented
NC0070 # 05 Y:1995 05 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,371 $3,525 Not Implemented
NC0070 # 06 Y:1995 06 1995 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $4,000 $10,000 Not Implemented
ND0230 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,172 $792 Implemented
ND0230 # 02 Y:1995 02 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,518 $500 Not Implemented
ND0230 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,549 $5,320 Implemented
ND0230 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,125 $1,088 Not Implemented
ND0230 # 05 Y:1995 05 1995 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $564 $650 Implemented
ND0230 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $57 $450 Not Implemented
WI0245 # 01 Y:1995 01 1995 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,645 $10,000 Not Implemented
WI0245 # 02 Y:1995 02 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,239 $2,000 Implemented
WI0245 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $722 $1,946 Implemented
WI0245 # 04 Y:1995 04 1995 INSTALL OCCUPANCY SENSORS $141 $300 Not Implemented
WI0245 # 05 Y:1995 05 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $720 $700 Not Implemented
WI0245 # 06 Y:1995 06 1995 RECOVER WASTE HEAT FROM EQUIPMENT $351 $1,000 Implemented
WI0245 # 07 Y:1995 07 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $137 $100 Implemented