IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,115

matching recommendations
Reset
SIC 349 Misc. Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0107 # 02 Y:1994 02 1994 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,565 $12,000 Implemented
AS0107 # 03 Y:1994 03 1994 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $202 $0 Not Implemented
AS0107 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,758 $1,000 Implemented
AS0107 # 05 Y:1994 05 1994 USE SYNTHETIC LUBRICANT $3,017 $1,098 Not Implemented
AS0107 # 06 Y:1994 06 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,256 $975 Implemented
AS0107 # 07 Y:1994 07 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $614 $0 Implemented
AS0107 # 08 Y:1994 08 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $116 $100 Not Implemented
AM0201 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $37,480 $3,520 Implemented
AM0201 # 02 Y:1994 02 1994 OPTIMIZE PLANT POWER FACTOR $18,700 $26,650 Not Implemented
AM0201 # 03 Y:1994 03 1994 PAY UTILITY BILLS ON TIME $1,915 $0 Implemented
UF0077 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,973 $14,637 Implemented
MA0291 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,823 $6,000 Not Implemented
MA0291 # 02 Y:1994 02 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,457 $1,072 Not Implemented
MA0291 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,086 $0 Implemented
MA0291 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $586 $0 Implemented
AR0015 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,666 $740 Not Implemented
AR0015 # 02 Y:1993 02 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,046 $6,750 Not Implemented
AR0015 # 03 Y:1993 03 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,562 $1,000 Implemented
AR0015 # 04 Y:1993 04 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,187 $14,712 Not Implemented
AR0015 # 05 Y:1993 05 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,409 $5,000 Not Implemented
AR0015 # 06 Y:1993 06 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,253 $12,000 Not Implemented
NC0012 # 01 Y:1993 01 1993 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $14,358 $14,233 Not Implemented
NC0012 # 02 Y:1993 02 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $27,321 $0 Not Implemented
NC0012 # 03 Y:1993 03 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,032 $4,500 Implemented
NC0012 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,829 $510 Implemented