IAC logo
IAC Assessment: MO0138
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0138
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1995
Principal Product aluminum and magnesium extrusions
NAICS n/a
SIC 3490 -
Sales $50,000,000-$100,000,000
# of Employees 365
Plant Area (Sq.Ft.) 1,458,375
Annual Production 43,001,342 Pounds
Production Hrs. Annual 6,120
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,275,573 35,080,012 kWh $0.06
Natural Gas $1,838,637 625,918 MMBtu $2.94
LPG $244,719 47,416 MMBtu $5.16
TOTAL ENERGY COSTS $4,358,929
RECOMMENDED SAVINGS* $96,809 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $66,641
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Disposal Administrative Changes Electricity Usage Natural Gas Water Disposal Administrative Changes
$ kWh $ MMBtu $ Tgal $ $
01: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$40,772
Cost:
-
- - - - - - $40,772 - -
-
kWh
-
-
MMBtu
-
-
Tgal
$40,772
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,269
Cost:
$848
$7,269 112,251 - - - - - - $7,269
112,251
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) Savings:
$19,282
Cost:
$4,373
- - $207 66 $19,075 5,375,633 - - -
-
kWh
$207
66
MMBtu
$19,075
5,375,633
Tgal
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$13,554
Cost:
$46,209
$13,554 208,968 - - - - - - $13,554
208,968
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$9,489
Cost:
$4,070
$9,489 146,249 - - - - - - $9,489
146,249
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,397
Cost:
$3,220
$1,397 21,688 - - - - - - $1,397
21,688
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,389
Cost:
$16,600
$3,389 52,169 - - - - - - $3,389
52,169
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,657
Cost:
$536
$1,657 25,498 - - - - - - $1,657
25,498
kWh
-
-
MMBtu
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$96,809
Cost:
$75,856
$36,755 566,823 $207 66 $19,075 5,375,633 $40,772 - $36,755
566,823
kWh
$207
66
MMBtu
$19,075
5,375,633
Tgal
$40,772
-
$
TOTAL IMPLEMENTED Savings:
$66,641
Cost:
$64,193
$25,869 398,886 - - - - $40,772 - $25,869
398,886
kWh
-
-
MMBtu
-
-
Tgal
$40,772
-
$
Savings
Cost
$ kWh $ MMBtu $ Tgal $ $
Electricity Usage Natural Gas Water Disposal Administrative Changes Electricity Usage Natural Gas Water Disposal Administrative Changes