Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
222
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0126 # 02 Y:1995 | 02 | 1995 | REDUCE VENTILATION AIR | $2,054 | $975 | Implemented |
NC0070 # 02 Y:1995 | 02 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,703 | $1,348 | Not Implemented |
NC0070 # 05 Y:1995 | 05 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,371 | $3,525 | Not Implemented |
NC0070 # 06 Y:1995 | 06 | 1995 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $4,000 | $10,000 | Not Implemented |
ND0230 # 02 Y:1995 | 02 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,518 | $500 | Not Implemented |
ND0230 # 01 Y:1995 | 01 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,172 | $792 | Implemented |
ND0230 # 06 Y:1995 | 06 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $57 | $450 | Not Implemented |
ND0230 # 05 Y:1995 | 05 | 1995 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $564 | $650 | Implemented |
ND0230 # 03 Y:1995 | 03 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,549 | $5,320 | Implemented |
ND0230 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,125 | $1,088 | Not Implemented |
WI0245 # 03 Y:1995 | 03 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $722 | $1,946 | Implemented |
WI0245 # 06 Y:1995 | 06 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $351 | $1,000 | Implemented |
WI0245 # 07 Y:1995 | 07 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $137 | $100 | Implemented |
WI0245 # 08 Y:1995 | 08 | 1995 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $283 | $0 | Not Implemented |
WI0245 # 10 Y:1995 | 10 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $119 | $0 | Implemented |
WI0245 # 02 Y:1995 | 02 | 1995 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,239 | $2,000 | Implemented |
WI0245 # 01 Y:1995 | 01 | 1995 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,645 | $10,000 | Not Implemented |
WI0245 # 09 Y:1995 | 09 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $518 | $0 | Implemented |
WI0245 # 05 Y:1995 | 05 | 1995 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $720 | $700 | Not Implemented |
WI0245 # 04 Y:1995 | 04 | 1995 | INSTALL OCCUPANCY SENSORS | $141 | $300 | Not Implemented |
AS0157 # 09 Y:1995 | 09 | 1995 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $758 | $2,100 | Implemented |
AS0157 # 08 Y:1995 | 08 | 1995 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,816 | $4,950 | Not Implemented |
AS0157 # 07 Y:1995 | 07 | 1995 | INSTALL TIMERS AND/OR THERMOSTATS | $248 | $600 | Implemented |
AS0157 # 06 Y:1995 | 06 | 1995 | INSULATE BARE EQUIPMENT | $953 | $658 | Not Implemented |
AS0157 # 05 Y:1995 | 05 | 1995 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,897 | $0 | Not Implemented |