Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,115
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0135 # 02 Y:1984 | 02 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $9,768 | $0 | Implemented |
KU0135 # 03 Y:1984 | 03 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $194 | $0 | Implemented |
KU0135 # 04 Y:1984 | 04 | 1984 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,716 | $2,000 | Implemented |
KU0135 # 05 Y:1984 | 05 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,516 | $2,774 | Not Implemented |
KU0135 # 06 Y:1984 | 06 | 1984 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $2,809 | $3,750 | Not Implemented |
KU0135 # 07 Y:1984 | 07 | 1984 | IMPROVE LUBRICATION PRACTICES | $6,508 | $2,250 | Not Implemented |
KU0135 # 08 Y:1984 | 08 | 1984 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $4,591 | $7,800 | Not Implemented |
KU0135 # 09 Y:1984 | 09 | 1984 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $4,203 | $100 | Implemented |
KU0135 # 10 Y:1984 | 10 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,389 | $5,000 | Implemented |
KU0135 # 11 Y:1984 | 11 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $1,487 | $1,300 | Not Implemented |
KU0135 # 13 Y:1984 | 13 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,886 | $78 | Implemented |
KU0135 # 14 Y:1984 | 14 | 1984 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $1,763 | $3,100 | Implemented |
KU0135 # 15 Y:1984 | 15 | 1984 | IMPROVE LUBRICATION PRACTICES | $1,143 | $25 | Not Implemented |
KU0135 # 16 Y:1984 | 16 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $659 | $125 | Not Implemented |
KU0135 # 17 Y:1984 | 17 | 1984 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,359 | $3,150 | Not Implemented |
KU0135 # 18 Y:1984 | 18 | 1984 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,061 | $1,400 | Not Implemented |
KU0135 # 19 Y:1984 | 19 | 1984 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $905 | $300 | Implemented |
KU0135 # 20 Y:1984 | 20 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $496 | $400 | Not Implemented |
KU0135 # 21 Y:1984 | 21 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $495 | $0 | Not Implemented |
KU0135 # 22 Y:1984 | 22 | 1984 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $368 | $10 | Implemented |
OK0152 # 01 Y:1984 | 01 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $146 | $250 | Not Implemented |
OK0152 # 02 Y:1984 | 02 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $196 | $530 | Implemented |
OK0152 # 03 Y:1984 | 03 | 1984 | USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY | $292 | $480 | Implemented |
OK0152 # 04 Y:1984 | 04 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $292 | $134 | Implemented |
OK0152 # 05 Y:1984 | 05 | 1984 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $204 | $0 | Implemented |