Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,115
matching recommendationsSIC | 349 | Misc. Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0059 # 02 Y:1982 | 02 | 1982 | INSTALL TIMERS AND/OR THERMOSTATS | $204 | $600 | Not Implemented |
OK0059 # 03 Y:1982 | 03 | 1982 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $122 | $0 | Not Implemented |
OK0059 # 04 Y:1982 | 04 | 1982 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $230 | $1,137 | Implemented |
OK0059 # 05 Y:1982 | 05 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $422 | $500 | Not Implemented |
OK0059 # 06 Y:1982 | 06 | 1982 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $2,097 | $984 | Implemented |
UD0051 # 01 Y:1982 | 01 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $460 | $0 | Implemented |
UD0051 # 02 Y:1982 | 02 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,295 | $753 | Implemented |
UD0051 # 03 Y:1982 | 03 | 1982 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $4,219 | $6,160 | Implemented |
UD0051 # 04 Y:1982 | 04 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,504 | $900 | Implemented |
UD0051 # 05 Y:1982 | 05 | 1982 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $3,312 | $1,500 | Not Implemented |
OK0046 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $905 | $244 | Not Implemented |
OK0046 # 02 Y:1982 | 02 | 1982 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $88 | $28 | Not Implemented |
OK0046 # 03 Y:1982 | 03 | 1982 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,800 | $148 | Implemented |
OK0046 # 04 Y:1982 | 04 | 1982 | INSULATE BARE EQUIPMENT | $82 | $288 | Not Implemented |
OK0046 # 05 Y:1982 | 05 | 1982 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,710 | $0 | Not Implemented |
OK0051 # 01 Y:1982 | 01 | 1982 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,367 | $200 | Implemented |
OK0051 # 02 Y:1982 | 02 | 1982 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,675 | $3,000 | Implemented |
OK0051 # 03 Y:1982 | 03 | 1982 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $13,620 | $8,300 | Not Implemented |
OK0051 # 04 Y:1982 | 04 | 1982 | OPTIMIZE PLANT POWER FACTOR | $5,976 | $3,900 | Not Implemented |
OK0051 # 05 Y:1982 | 05 | 1982 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $130 | $0 | Implemented |
OK0051 # 06 Y:1982 | 06 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29 | $13 | Implemented |
OK0051 # 07 Y:1982 | 07 | 1982 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,612 | $12,150 | Implemented |
OK0057 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $761 | $2,402 | Not Implemented |
OK0057 # 02 Y:1982 | 02 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $12,500 | $500 | Implemented |
OK0057 # 03 Y:1982 | 03 | 1982 | OPTIMIZE PLANT POWER FACTOR | $20,704 | $36,360 | Implemented |